Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells ExecutedSpon, Ernest
Science
Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells Executed
Spon, Ernest
Boring; Water-supply; Wells
_Durham._--Large quantities of water are pumped from the lower Permian
sandstone beneath the magnesian limestone of this county, and are used
for the supply of the towns of Sunderland, South Shields, Jarrow, and
many villages. The quantity, calculated by Daglish and Foster to reach
five millions of gallons a day, is obtained from an area of fifty square
miles overlying the coal measures. The water-level has not been lowered
in the rock by these operations. Along the coast it is that of mean
tide, and inland rises to a level of 180 feet. In the coal measures
below there is little water, and that little is saline. Sedgwick gives
the strata as red gypseous marls, 100 feet; thin bedded grey limestone,
80 feet; red gypseous marls, slightly salt, 200 feet; magnesian
limestone, 500 feet; marl slate, 60 feet; lower red sandstone, 200 feet.
_Coventry._--Warwickshire. The town is supplied with 750,000 gallons of
water a day from two bore-holes made in the bottom of the reservoir. The
bore-holes are respectively 6 inches and 8 inches diameter, and 200 feet
and 300 feet deep. The town is situated on the Permian formation, but
Latham states that the supply is procured from the red sandstone, and,
from observations made, it has been found that the two bore-holes yield
water at the rate of 700 gallons a minute.
TRIAS STRATA.
_Birkenhead._--There are here several deep wells belonging to the
Tranmere Local Board, the Birkenhead Commissioners, and the Wirral
Water Company, yielding together about 4,000,000 gallons a day. Figs.
222, 223, show a section and plan of the No. 2 or new engine well at the
Birkenhead Waterworks. The shaft is 7 feet diameter for 105 feet, with a
bore-hole 26 inches for 35 feet, 18 inches for 16 feet, 12 inches for 99
feet, and 7 inches for 150 feet, or a total depth from surface of 405
feet. The water-level is about 95 feet from surface when the engine is
not at work. At the upper water-level, shown in the 26-inch hole, the
yield was at the rate of 1,807,400 gallons in twenty-four hours, at the
lower level at the rate of 2,000,000 gallons in the same time. At the
water-level indicated in the 7-inch bore, water was met with in large
quantities. The old engine well is almost identical.
[Illustration: NEW ENGINE WELL, BIRKENHEAD WATERWORKS.
Fig. 222.]
[Illustration: PLAN.
Fig. 223.]
[Illustration: Fig. 224.
WELL AT ASPINALL'S BREWERY, BIRKENHEAD.]
[Illustration: Fig. 225.
PLAN]
[Illustration: Enlarged Parts.
_at_ A. A.
_at_ B. B.
_at_ C. C.
_at_ D. D.
_at_ E. E.
Fig. 226.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account