Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells ExecutedSpon, Ernest
Science
Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells Executed
Spon, Ernest
Boring; Water-supply; Wells
[Illustration: WELL AT BOLCKOW AND VAUGHAN'S, MIDDLESBOROUGH
Fig. 236.]
Headings have also been driven W. and N. of No. 2 well, at a cost of
30_s._ a yard. The western heading is 213 feet long, driven with a
slight rise, and gave much water. There are two headings N., running in
the direction of the railway, one over the other. The lower was driven
level with the bottom of the shaft, but no water met with; the upper is
36 feet from the surface, and is intended to carry away surplus water
down to a line of earthenware pipes which are led along the railway to a
low-level reservoir.
In the eastern heading there is a rise of 4 feet, owing to the nature of
the strata; and after it had been driven 510 feet, well No. 3 was sunk
for ventilation and for drawing out material. A bed of very hard
sandstone, 63 feet long, was passed, cost 4_l._ 10_s._ a yard, and
beyond came marl, in which driving cost 45_s._ a yard. This heading was
continued 330 feet beyond No. 3, and an air-hole 3 inches diameter put
down 126 yards deep, but no water was met with. The bed of hard
sandstone was also found in driving the lower N. heading, which was
discontinued after going into it some 5 or 6 feet. The yield from these
wells is about 600,000 gallons a day, and recently a new bore-hole at
No. 3 well, when down 350 feet, gave some 380,000 gallons a day
additional.
_Leek._--The Potteries waterworks have also wells at the Wallgrange
Springs, near Leek; these rise from the conglomerate beds, and are
stated to yield 3,000,000 gallons daily. The water from these springs is
pumped into Ladderidge reservoir, and is distributed from thence into
the town of Newcastle-under-Lyme and the Potteries.
[Illustration: WELL AT ROSS, HEREFORDSHIRE.
Fig. 239.]
[Illustration: PLAN.
Fig. 240.]
_Middlesborough._--The Figs. 235 to 238 are sections and plans of a
well at the works of Messrs. Bolckow and Vaughan, Middlesborough, made
under the direction of S. C. Homersham, C.E. A trial hole was first put
down to a depth of 398 feet 6 inches, and a shaft afterwards sunk by
Messrs. Docwra and Son to that depth, through alternating beds of clay,
sand, gypsum, and sandstone. At the bottom of the shaft a bore-hole of
18 inches diameter throughout was made with Mather and Platt's apparatus
to a depth of 1312 feet; the first 1160 feet of which were through new
red sandstone interspersed with beds of clay, white sandstone, red
marl, and gypsum. Next came 40 feet of gypsum, hard white sandstone, and
limestone; and the remaining 100 feet were through red sandstone, pure
salt rock, occasional layers of limestone, and then salt rock to the
bottom. The gross time spent in sinking this bore-hole was 510 days, or
an average of 2 feet 5 inches a day.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account