Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells ExecutedSpon, Ernest
Science
Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells Executed
Spon, Ernest
Boring; Water-supply; Wells
At Passy great strength was given to the head of the striking tool, and
to the part of the machinery applied to turn the trepan, because the
great weight of the latter superinduced the danger of its breaking off
under the influence of the shock, and because the solidity of this part
of the machinery necessarily regulated the whole working of the tool.
The head of the boring arrangement was connected with the balance-beam
of the steam-engine by a straight link-chain, with a screw-coupling,
admitting of being lengthened as the trepan descended, Figs. 108, 109.
The balance-beam, in order to increase its elastic force in the upward
stroke, is in Kind's works made of wood, in two pieces; the upper one
being of fir and the lower one of beech. The whole of the machinery is
put in motion by steam, which is admitted to the upper part of the
cylinder, and presses it down, and thus raises the tool at the other end
of the beam to that part in connection with the cylinder. The
counterpoise to the weight of the tools is also placed upon the
cylinder-end of the beam. The cylinder receives the steam through ports
that are opened and closed by hand, like those of a steam-hammer; so
that the number of the strokes of the piston may be increased or
diminished, and the length of the strokes may be increased, as occasion
may require.
[Illustration: Side Elevations on Balance-beam Connection.
Figs. 108, 109.]
The balance-beam is continued beyond the point where the piston is
connected with it, and it goes to meet the blocks placed to check the
force of the blow given by the descent of the tool. The guides of the
piston-head are attached to the part of the machinery that acts in this
manner; but at Passy, Kind made the balance-beam work upon two free
plummer-blocks, or blocks having no permanent cover, that they might be
more easily moved whenever it was necessary to displace the beam, for
the purpose of taking up or letting down the rods, or for changing the
tools; for the balance-beam was always immediately over the centre of
the tools, and it therefore had to be displaced every time that the
latter were required to be changed. This was effected by allowing the
beam to slide horizontally, so as to leave the mouth of the pit open.
The counter-check, above mentioned, likewise prevented the piston from
striking the cylinder cover with too great a force, when it was brought
back by the weight of the tools to its original position. The operation
of raising and lowering the rods, or of changing the tools, was
performed at Passy by a separate steam-engine, and the shell was
discharged into a special truck, moving upon a railway expressly laid
for this purpose in the great tower erected over the excavation. All
these arrangements were in fact made with the extreme attention to the
details of the various parts of the work which characterizes the
proceedings of foreign engineers, and conduces so much to their success.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account