A number of experiments have been made to discover a cement which will
not harden too quickly, and which, when hardened, will form a perfectly
compact and solid mass. A composition having the following proportions
has been found the best;--Hydraulic lime, from the lias near Metz,
slaked by sprinkling, 1 part; picked sand, from the Vosges sandstone, 1
part; trass, from Andernacht on the Rhine, 1 part; cement from Ropp
(Haute Saone), 1/4 part.
Six men are employed in putting in the cement;--two at the windlass for
letting down the ladle, two for working the rods attached to the piston,
and two on the working platform. The rods referred to have been found
such an inconvenience, that lately a rope on another windlass has been
used, and an appliance arranged for dropping the piston by moving the
rope.
[Illustration: Sectional Elevation showing Base to the Tubbing.
Fig. 157.]
When a sufficient time has elapsed for the cement to harden, the water
within the tubbing, now effectually separated from the feeders, is drawn
out by a bucket worked by the crab engine,--an operation which occupies
from one to three weeks, according to circumstances. When concluded, the
joint between the moss box and the rock bed can be examined. In some
cases this joint is considered sufficient; but it is generally thought
desirable to form a base to the tubbing by building a few feet of
brickwork in cement on a ring or crib of wood, as in Fig. 157. Another
wooden crib is then placed on the top of this brickwork, and above
this, two cast-iron segmental wedging cribs with a broad bed also wedged
perfectly tight. On the base so prepared, four or more rings of tubbing
in segments are fixed, the top ring coming close against the bottom of
the moss box. This being done the work is completed, and the sinking of
the shaft is continued in the ordinary way.
The application of the boring trepan is not to be recommended in the
sinking of the dry part of the shaft. The use of the tool would cause
the sinking to extend over a longer period, since the breaking of the
rock passed through into such minute particles would lead to loss of
time.
DRU'S SYSTEM.
[Illustration: Dru's System.
Sectional Elevation showing Surface Arrangement.
Fig. 158.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account