Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.Jeans, J. Stephen (James Stephen)
History
Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.
Jeans, J. Stephen (James Stephen)
Canals
_The North Sea and Baltic Ship Canal._—This new ship canal is to be
international as well as national in its character. It will reduce
the sea passage, as compared to the Sound route, by 237 sea miles,
shorten the journey of sailing vessels by at least three days, and that
of steamers by about twenty-two hours in normal weather, and these
advantages are to cost the shipowners 9_d._ per registered ton when
the canal is navigable. About 35,000 vessels pass through the Sound
annually. It is, moreover, intended to strengthen the offensive and
defensive power of Germany. It may, however, be remarked that Count
Moltke never from the first gave the plan his cordial support from a
strategical point of view, maintaining then, as now, that the money
which the canal is to cost would have been more judiciously spent if
employed to strengthen the national navy.
The Baltic Ship Canal begins at Holtenau, a small village just north
of the royal dockyard of Kiel, on the Baltic, and enters the Elbe
15 miles above the North Sea, near Brunsbütte. It will have a total
length of 75 to 80 kilometres, as seen on the sketch-map at page 125.
Its width is to be, on the water surface, 60 metres; on the bottom,
26 metres; its depth is to be 8½ metres, and its total cost 156
million marks, as estimated. The canal may be looked upon as a mere
cutting, in which the water-level is to be that of the Baltic Sea,
and there will only be flood-gates or sluices where it enters the
river Eider and at its termination in the Elbe; these will be, as a
matter of fact, open all the year round. For the convenience of the
Royal Marine, rather extensive works will be carried out at the Elbe
embouchure, consisting of large and small locks, and eventually a
floating basin for at least four large armour-clads, besides coaling
stations at either end of the canal. The four railways crossing the
canal, as well as the two main post roads, will be carried over it by
means of iron swing-bridges; and steam and manual pontoons will serve
for the other various crossing-points of the canal. There are no
engineering difficulties to contend with, excepting perhaps a boggy
portion not very remote from the Elbe. The highest point of cutting
is about 24 kilometres distant from the Elbe, and here it will be
30 metres distant from the bottom level of the canal, otherwise the
ground to be removed is mostly sand or sandy loam.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account