Three basins, formed by widening the canal at certain places, have
been provided for the export and import trade, having a total area of
430 acres; but it is considered that these will not afford sufficient
accommodation. Between 1877 and 1882, 5,304,000 cubic yards were
excavated, out of a total of about 8,700,000 cubic yards. The working
season, however, at St. Petersburg is short, and only one hundred and
twenty-five days can be reckoned upon in the year, making an average
of 8480 cubic yards per day. Water was admitted into the canal in the
presence of the Emperor Alexander III. in November 1883; but the canal
was not made available for the passage of vessels until 1884. The canal
is reported to have greatly promoted the commercial prospects of the
capital. This was much required, as, previous to the construction of
the Poutiloff Canal, only vessels of very small size and light draught
could ascend the Neva for the purpose of loading and unloading at
St. Petersburg, while those of more than very limited draught were
compelled to stop at Cronstadt, and discharge or load there. The cost
of sending goods from Cronstadt to the capital was calculated at more
than the freight from England,[104] without taking into account the loss
of time, which often amounted to ten or fourteen days, and sometimes
more.
The Poutiloff Canal was constructed by the Russian Government, at a
cost of about a million and a quarter sterling, and has been thrown
open free of tolls. The points A and B on the plan, where warehouse
accommodation has been provided, are in communication by rail with all
the railways going out of St. Petersburg, and can also be approached by
lighters with cargo for transport. It is expected that the canal will
cause merchant-ships ultimately to abandon Cronstadt entirely.
At the St. Petersburg end of the canal, a Government Commission
recommended some years ago, that two basins would be required, each 22
feet deep, and capable of holding 90 steamers and 70 sailing vessels,
with a third basin, having a depth of 10½ feet, in order to accommodate
the barges arriving from the interior. The cost of these works has been
estimated at over a million sterling. There has been a good deal of
controversy as to the proper location for the port of St. Petersburg
at the end of the canal. The original proposal was to erect the docks
and basins at the head of the canal, close to the Poutiloff Ironworks,
but the Ministry of Finance is reported to have favoured a project for
constructing a port on the opposite side of the river—that is on the
right bank—on the ground that it would be much less expensive. But the
utility of the canal has already been so greatly proved, that the docks
originally projected will be likely to be insufficient before long.
About 2500 ships are stated to be annually employed in the foreign, and
700 in the local transport trade of the capital.[105]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account