When the canal was first designed, in 1856, it was supposed that two
vessels, being towed, could easily pass where the bottom width was 144
feet, or double the normal width adopted. At the present day, however,
when vessels of nearly 200 feet in width propel themselves through the
canal, a bottom width of 230 feet has been proposed for the 81 miles
from Port Said to the southern end of the Bitter Lakes, where the tidal
currents do not exceed one knot an hour, and 262 feet for the rest of
the distance to Suez, where the currents often exceed two knots, in
order that the vessels may pass each other freely. The cost of this
widening was estimated at 8,240,000_l._, supposing the depth of the
canal remained as at present, 26¼ feet below low-water of ordinary
spring tides, but it would be increased by 975,200_l._ if the depth was
augmented to 29½ feet, unless the proposed width could be reduced to 18
feet.
The construction of a second canal, within the limits of the company’s
lands, having, like the existing canal, a bottom width of 72 feet,
widened out to 131 feet through the small Bitter Lakes, was estimated
at from 8,200,000_l._ to 8,920,000_l._, with an additional cost of
698,800_l._ if made 29½ feet deep.
The third plan took into consideration the different velocities of
the tidal currents north and south of the Bitter Lakes. Assuming that
the greater velocity might lead to collisions between vessels passing
on a single enlarged canal, it would be advisable to restrict the
enlargement to the northern portion, and to form a second canal between
the Bitter Lakes and Suez. For reasons which are fully set forth in
their Report, the Commission decided in favour of the enlargement of
the existing canal. The estimated cost of the works, which are now in
progress, is rather over 8,000,000_l._
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account