The first and the most serious difficulty to be encountered was that
of controlling the waters of a torrential stream, almost equal to
that of some of the chief rivers of Italy, through which the canal
was to run. This stream, which crosses and recrosses the line of the
canal twenty-seven times, as shown in the drawing attached hereto, has
several different levels, and would, if left to itself, be certain to
destroy the canal in a very short time. It had therefore to be dealt
with by constructing an enormous embankment raised 45 feet above the
waters of the Chagres, so as to allow of their gradual escape. In this
dam there are 26 millions of cubic yards of cutting; in the Culebra
Col, a channel cut right through a mountain more than 300 feet above
sea level, there were estimated to be 37 millions more; and in the
entire line of the canal there were calculated to be about 75 to 100
millions of cubic yards of excavation, to accomplish which a serious
writer in the _Edinburgh Review_ maintained that it would require the
labour of 20,000 men for forty-two years.
Worse than all, however, was the dreadful and deadly climate. Five
months of the year are continually wet. There are few fine days in the
other seven months. The annual rainfall is twelve to fifteen times
that of Europe. The mortality is excessive. The cost of labour is
consequently high,[190] but pay what they may, the company could not
command the amount of labour it was anxious to employ. For the most
part the labour has had to be imported from Europe and the West Indies.
The men were brought to Panama at the expense of the Company, but a
very large proportion of them left again immediately, for various
reasons, so that the company has not been able to keep up the proper
quotas of men with which they undertook to provide their contractors,
who were left at liberty to throw up their contracts when they ceased
to be remunerative. The cost of the undertaking was thus enormously
increased beyond the original estimates. The difficulty of procuring
ways and means, and the high prices that had to be paid for borrowed
money, have also seriously added to the expenditure. Another serious
element of cost has been the outlay incurred in providing hospital and
other facilities, and the maintenance of the usually very considerable
numbers who were stricken with illness, induced by their unhealthy
surroundings. These and other difficulties have so seriously weighed
upon the undertaking that its accomplishment has been pronounced
impossible, and M. de Lesseps and his colleagues have been denounced
for following a “will-o’-the-wisp.” They have, however, persevered
with their task for about eight years, and have made heroic, and
almost superhuman efforts to keep the enterprise on its legs. In this
effort they have had to depend absolutely upon their own countrymen,
although they have much less maritime interest in the matter than the
people of England and the United States of North America.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account