Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.Jeans, J. Stephen (James Stephen)
History
Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.
Jeans, J. Stephen (James Stephen)
Canals
With abundant water power at the several locks and the
dam, there is no reason why the whole canal should not
be sufficiently illuminated by electric lights; and with
beacons and range lights in the river and lake, vessels can
travel at all times with perfect safety. The estimated cost
of the canal is 64 millions of dollars, or 13,000,000_l._
including electric lighting, &c., and it is calculated that
the work can be completed in six years.
ESTIMATES OF COST MADE IN 1888.
Per cubic yard.
TABLE OF PRICES. dols.
Excavation in earth 0·40
Excavation in rock 1·50
Excavation in rock (submarine) 5·00
Dredging 0·20 and 0·40
Concrete 6·00 and 9·00
Stone pitching 2·00
Stone in breakwaters 1·50
Puddle 0·75
Timber 0·50
_Western Division:—_ dols.
Excavation and embankment 8,496,292
Diversion of Rio Grande and Rio Lajas 1,870,447
Other auxiliary work, including R. R. 753,329
Locks (four) 4,762,480
Harbour of Brito 1,611,500
───────────
Total $17,484,048
_Middle Division:—_ dols.
Lake Nicaragua 379,520
River San Juan 3,074,791
Valley of R. San Francisco 1,112,413
Dam across R. San Juan 1,858,975
Embankment across R. San Francisco 1,331,262
Embankment near Ochoa 45,578
Railroad 240,000
──────────
Total $8,042,539
_Eastern Division:—_ dols.
The “Divide” 11,982,938
From the “Divide” to Greytown 8,077,294
Locks (three) 3,561,515
Railroad 320,000
Harbour of Greytown 1,766,625
───────────
Total $25,708,372
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account