Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.Jeans, J. Stephen (James Stephen)
History
Waterways and Water Transport in Different Countries: With a description of the Panama, Suez, Manchester, Nicaraguan, and other canals.
Jeans, J. Stephen (James Stephen)
Canals
of small boats and barges only, so that they could not be utilised
for sea-going craft. For most practical purposes, such waterways
were therefore of little use. What was felt to be necessary was a
canal sufficiently broad and deep to admit of the passage of large
ocean-going steamers right up to the warehouses and mills of Manchester
and the neighbouring towns. This necessity was all the more keenly
felt, and all the more readily acted upon, that the railway rates
between Manchester and Liverpool were generally onerous and oppressive.
[Illustration: TRACING OF THE MANCHESTER SHIP CANAL.]
It was under the circumstances just stated that a meeting was held at
the house of Mr. Daniel Adamson, in June 1882, to discuss the question
of constructing a canal from Manchester to the sea.
The outcome of this meeting was the appointment of Mr. Hamilton
Fulton and Mr. E. Leader Williams as engineers, with instructions
to investigate the subject, and to submit separate schemes to a
provisional committee showing the best means of carrying out such
a work. Mr. Fulton’s scheme was to improve the existing navigation
through the estuary of the Mersey by dredging and retaining walls, and
to excavate, straighten, and improve the Mersey and Irwell Navigation
to Manchester, leaving, when completed, a tidal canal to Manchester,
with a depth of 22 feet at low water spring tides. Passing places were
to be left every 3 or 4 miles, and the traffic was to be worked as on
the Suez Canal. Docks were to be constructed, and all necessary works.
The gross estimate, including water and land, was 5,072,291_l._
Mr. Williams’s proposal was to construct a canal 22 feet deep and 100
feet wide, with three locks. The channel through the estuary was to be
confined between training walls from Garston to Runcorn, and from there
the channel was to be improved and straightened to Latchford (first
lock), and be practically a tideway. Between Latchford and Manchester
it was to be a canal with locks, the existing navigation to be improved
and utilised where practicable, otherwise to be filled up; while docks
were to be made at Latchford, Irlam, and Barton. The water-level in the
docks at Manchester were to be 8 feet below the level of the quays.
The estimate of cost, including works, water, and land, was about
5,160,000_l._
[Illustration: MANCHESTER SHIP CANAL MANCHESTER AND SALFORD DOCKS.]
Mr. Williams argued that were the tide to be brought to Manchester, the
bottom of the dock would be 92 feet below the surface of the ground,
and therefore most inconvenient for working. The docks and canal ending
abruptly, would, moreover, form a depositing place for silt brought up
by the tide, and the tide flowing up or down would materially affect
the passage of vessels proceeding the reverse way.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account