Many piers and abutments of bridges in shallow or moderately deep
water are built by means of coffer-dams of timber and clay puddle. The
coffer-dam forms a water-tight wall round the site of the foundation,
from which the water is pumped out, and the excavation carried down to
the depth required. In very shallow water it is sometimes sufficient
to drive only a single row of piles, and form a bank of good clay
puddle on the outside, as shown in Fig. 122. In deep water it is
necessary to drive a double row of piles, 3 or 4 or more feet apart,
and fill in the space between with clay puddle, as shown in Fig. 123.
The piles for coffer-dam work should be carefully selected, of good
timber straight, and correctly sawn on the contact faces. Guide-piles
are first driven in proper line and position round the intended
foundation. To these strong horizontal double waling pieces are
securely bolted, one on each side of the guide-pile, one pair near the
top, and the other pair as low down as can be placed. The sheeting
piles, which are lowered down between the horizontal waling or guiding
pieces, are driven as close to one another as possible, being assisted
in doing so by the sheet-pile shoe, shown on Fig. 124, which is made
not with a point like an ordinary pile shoe (Fig. 125), but with a 128
cutting edge slightly inclined, so that in driving the tendency of the
pile is to drift towards the pile previously driven. Sometimes the
outer row of piles consists of whole balks, and the inner row of half
balks; the size of the piles must, however, be regulated by the depth
and current of the water. When both rows of piles have been completed,
the space between should be dredged out, and then filled with
carefully prepared clay puddle. To enable the puddle to adapt itself
thoroughly to the wooden sides, it is desirable to remove the inside
walings after all the piles are driven, as any internal projections
interfere with the proper punning and settling of the puddle. The
swelling of the puddled clay has a tendency to force apart the two
rows of piles, and to counteract this as much as possible, iron
tie-rods should be passed through from side to side every few feet,
and screwed up against large washers placed on the outside of the
outer walings. Strong struts or cross-bracing of timber must be placed
from side to side inside the coffer-dam to resist the pressure of the
water in the river. This cross-bracing can be removed gradually as the
work of building progresses upwards, and be replaced with short struts
wedged in against the sides of the finished courses.