Railway Construction — John Stuart Mill — John Shaqi
Railway Construction
John Stuart Mill · en
In Fig. 102, the cutting being deep, almost up to the level of the
public road, the foundations of the wing walls are built in steps,
resulting in a minimum of masonry below the finished ground line.
Where the cutting is shallow, and the public road has to be brought up
to the bridge on an embanked approach, the greater portion of the wing 133
walls will have to be built up from the solid or original ground, and
there will be a large amount of masonry below the finished ground
line, as indicated in Fig. 128.
In some cases of over-line bridges it is necessary to curve the wing
walls to correspond to the road which turns off to the right or left
after crossing the railway, as shown in Fig. 129; or the wing walls
may have to form two separate curves where the road branches off in
two directions after leaving the bridge, as shown in Fig. 130.
Fig. 131 shows plan, elevation, and cross-section of an under-line
arch bridge, considerably on the skew, carrying a railway over a
river. The wing walls are curved, and very similar in type to some of
those in preceding examples. The river bed and ground alongside being
of solid rock, good foundations were obtained at a very moderate cost.
On many railways constructed in the beginning as single lines only,
the over-line bridges have been built for double line. The additional
cost in the outset has been small, compared with the great expenditure
which would be incurred afterwards in reconstructing the bridges to
suit a double line.
The general arrangement of abutments and wing walls shown in the
foregoing examples will apply to similar classes of bridges where
girder-work is adopted instead of arching.
There are many ways of forming the floor or deck of a girder bridge
intended to carry a railway over a road or stream. In some cases it
will be imperative to have a thoroughly water-tight floor to prevent
rain-water percolating through to the roadway below; while in others,
such as bridges over streams, and secondary roads, this special
provision will not be necessary, and a lighter and more economical
floorway can be adopted. A strong wrought-iron or steel-plate
flooring, with its corresponding filling and ballasting, means not
only so much additional cost in the flooring proper, but also so much
additional dead weight to be carried by the main girders.
[Illustration: Fig. 132, 133, 134, 135, 136, 141]
Fig. 132 is a sketch of rolled joist-iron I-girders and timber floor
frequently adopted for small farm roads and cattle creeps of 10 or 12
feet span. A beam of timber is fitted in between the two rolled
joist-irons, and the three pieces securely fastened together with
strong iron bolts placed about 3 feet apart. These small compound
girders rest on bearing-plates of wrought or cast iron, and are held 135
together and to gauge by tie-rods, as shown. The rails are spiked or
bolted down on to the timber beams, and the flooring formed of strong
planking.