Fig. 141 shows cross-section of a plate-girder bridge, of 36 feet 139
span, carrying six lines of way across a street. Strong plated
cross-girder bracing, at 4 feet 8¼ inch centres, is riveted to the
main girders, and the top is covered with old Barlow rails, 12 inches
wide, and weighing 90 lbs. per lineal yard. A layer of asphalte, about
1½ inches thick, is carefully laid all over the upper surface of these
rails to make a thoroughly water-tight floor. Clean gravel is placed
on the top, on which are laid the sleepers and rails of the permanent
way. Rain-water passes through the gravel into the hollows of the
Barlow rails, and finds its way into suitable drains provided at each
abutment. This arrangement not only prevents the falling of drip-water
into the street below, but permits of the alterations of the lines of
way, or putting in of cross-over roads on the surface above. The
outside main girders are made deeper, and are surmounted by close
cast-iron parapets.
Fig. 142 gives the particulars of a three-span plate-girder bridge,
constructed to carry a double line of railway over two other railways
and a canal, the load being placed on the lower flange. Two main
girders are used for each line of way. Strong plated cross-girders are
placed at 5 feet 3 inch centres, and on the top of these is laid a
flooring of old Barlow rails, terminating at the sides with sloping
wing-plates riveted to the cross-girders and main girders, the entire
surface being covered with an inch and a half layer of asphalte. Good
gravel ballast is placed on the top, on which are laid the sleepers
and rails. One central main girder of sufficient strength would have
been as efficient as the two central girders, but there was a
practical difficulty which prevented its adoption. The new girder-work
was built to replace an old structure of peculiar arrangement, and to
keep the traffic going on one line there was no alternative but to
make each line of way complete in itself.
[Illustration: Fig. 140, 144]
Fig. 143 illustrates an example of jack arches in concrete built
between strong plate-girders. The span of the girders was only 16
feet, but the opening or roadway was of considerable length, and
passed under a portion of a busy station yard. The girders are placed
at 6-foot centres, and tied together in pairs by 1¼-inch tie-rods,
three to the span, spaces of 6 inches in plan being allowed between
each set of the rods. The concrete was curved up to the top plate of
the girder, as shown, and the entire surface covered with a thick
layer of asphalte, on which were placed the ballast and permanent way. 141
Brickwork might have been used for the jack-arching, but concrete was
considered more convenient.