A Floating City, and The Blockade RunnersVerne, Jules
History
A Floating City, and The Blockade Runners
Verne, Jules
Great Eastern (Steamship) -- Fiction; United States -- History -- Civil War, 1861-1865 -- Blockades -- Fiction
And now, why all these delays? Why so many new arrangements on board the
“Great Eastern,” a comparatively new ship? The reason may be explained
in a few words.
After twenty passages from England to America, one of which was marked
by very serious disasters, the use of the “Great Eastern” was
temporarily abandoned, and this immense ship, arranged to accommodate
passengers, seemed no longer good for anything. When the first attempt
to lay the Atlantic cable had failed,—partly because the number of ships
which carried it was insufficient—engineers thought of the “Great
Eastern.” She alone could store on board the 2100 miles of metallic
wire, weighing 4500 tons. She alone, thanks to her perfect indifference
to the sea, could unroll and immerse this immense cable. But special
arrangements were necessary for storing away the cable in the ship’s
hold. Two out of six boilers were removed, and one chimney out of three
belonging to the screw engine; in their places large tanks were placed
for the cable, which was immersed in water to preserve it from the
effects of variation of the atmosphere; the wire thus passed from these
tanks of water into the sea without suffering the least contact with the
air.
The laying of the cable having been successfully accomplished, and the
object in view attained, the “Great Eastern” was once more left in her
costly idleness. A French company, called the “Great Eastern Company,
Limited,” was floated with a capital of 2,000,000 francs, with the
intention of employing the immense ship for the conveyance of passengers
across the Atlantic. Thus the reason for rearranging the ship to this
purpose, and the consequent necessity of filling up the tanks and
replacing the boilers, of enlarging the saloons in which so many people
were to live during the voyage, and of building extra dining saloons,
finally the arrangement of a thousand berths in the sides of the
gigantic hull.
The “Great Eastern” was freighted to the amount of 25,000 francs a
month. Two contracts were arranged with G. Forrester and Co., of
Liverpool, the first to the amount of 538,750 francs, for making new
boilers for the screw; the second to the amount of 662,500 francs for
general repairs, and fixings on board.
Before entering upon the last undertaking, the Board of Trade required
that the ship’s hull should undergo a strict examination. This costly
operation accomplished, a long crack in her exterior plates was
carefully repaired at a great expense, and the next proceeding was to
fix the new boilers; the driving main-shaft of the wheels, which had
been damaged during the last voyage, had to be replaced by a shaft,
provided with two eccentric wheels, which insured the solidity of this
important part. And now for the first time the “Great Eastern” was to be
steered by steam.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account