3. There will be no embankment over 20 feet high, no bridge over 30 feet
high.
4. The distance to Frankfort will not be increased two miles in length
over the present travelled road.
5. There will not be as much rock excavation in the grading as will be
required to construct the road.
6. On the thirty feet grade which has been tentatively adopted, a single
horse is capable of travelling with seven tons weight with as much ease
as five horses can draw two tons on our present roads in their best
condition. Hence it follows that one man and two horses can transport on
the Railway as much weight in the same time as 35 horses and seven men
on our present roads."
* * * * *
That part of the road from Lexington to Villa Grove, six miles west of
Lex. was known as the "first division"; from Villa Grove to Frankfort
was designated "second division."
* * * * *
Mr. Kneass, the chief engineer, submitted "a grade table and a table
exhibiting the length of straight line, length of curve and radius of
curvature" to the Directors on October 14th, 1831.
* * * * *
John Holburn and Company were employed to furnish stone rail sills at
37-1/2 cents per perch.
* * * * *
On April 20th, 1831, The Reporter, which by the way, was known as "Mr.
Clay's organ," gives a most entertaining description of a Directors
meeting. It says:
"The Stockholders of the Lexington and Ohio Rail Road Company met at the
Court House in Lexington on Saturday last. H. Clay was called to the
Chair and H. I. Bodley acted as Secretary.
The meeting was large, most of the Stockholders, representing upwards
of six hundred thousand dollars, were present. The Stockholders at
Louisville were represented by Messrs. J. S. Snead, B. Lawrence, S. S.
Nicholas, J. I. Jacob and George Keats.
Mr. E. I. Winter (President of the Company) addressed the meeting an
hour and a half. He described the route as surveyed by Mr. Kneass, the
Engineer, entered into explanations respecting the estimates and made
various calculations as to the probable cost of the work. He presented
a very satisfactory and clear view of the means of the Company--its
flattering prospects--the great resources of this section of the
country &c.
After much discussion it was
_Resolved_--That the Directors of the Lexington and Ohio Rail Road
Company be requested to take measures to put a proportion of the road
under contract, not exceeding eight miles at Louisville and seven at
Lexington, provided the same can be done at a cost not exceeding by 10
per cent the estimate made by Mr. Kneass, Engineer.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account