A practical treatise on coach-building historical and descriptive : $b Containing full information of the various trades and processes involved, with hints on the proper keeping of carriages, &c.Burgess, James W.
History
A practical treatise on coach-building historical and descriptive : $b Containing full information of the various trades and processes involved, with hints on the proper keeping of carriages, &c.
Burgess, James W.
Carriage and wagon making; Carriages and carts
The body generally receives a coat of priming on the bottom, top, and
inside in the wood shop. This is called “slushing,” so that when the
body arrives in the proof shop these parts are one coat in advance of
the other portions.
The top and the panels require a considerable amount of attention.
If the top is constructed of green timber it will cause the covering
to rise up in ridges or blisters, and when the canvas is put on, if
it is not well stretched when it is nailed on, the air gets under
it and causes a deal of trouble. The inside of the top should have
a good heavy coating of slush or oil lead to preserve the wood from
dampness, and the outside of the top should be properly primed with
clean smooth lead colour. When this is dry the nail holes should
be puttied in, and sunken places brought forward with firm drying
putty, which will bear blocking down with sand-paper, leaving the top
as level as possible. When this is dusted off clean, apply a heavy
coat of lead in oil, with sufficient varnish in it to hold the lead
together.
The inside of the body should be well coated, as it is a great
protection to the panels. The priming coat should be composed of the
best pure keg lead and oil, with only a small quantity of drier, and
allowed at least a week in which to dry. This coat should be well
worked in to the nail holes and the grain of the wood. A well-worn
springy brush is the best. When this coating is dry sand-paper it
carefully, and apply a second coat of lead colour, using less oil.
The third day after this, putty the nail holes half full; two after
this, apply the third coat, mixing it so that it will dry firmly, no
oil being used except that which is present in the lead. When dry,
finish puttying the nail holes; also putty up any of the grain that
may appear too open, or else rub into the grain some lead mixed up
very heavy.
The body, after having received three coats of lead, and been puttied
up, may now stand for two or three days. When it is again taken in
hand, sand-paper off any putty that may be above the level of the
surface; dust off, and brush on a level coat of lead, which must
dry hard and firm. Every coat of lead should be laid on as level
as possible, and made to fill up the grain of the wood as much as
possible. These coats are called “rough stuff.” The body may now
stand for three or four days, when it will be ready for the filling
up.
There are two very important things to be studied in coach-painting.
First, to form a surface hard enough to hold out the varnish and
disguise the grain of the wood; and second, to have the first and
intermediate coats of paint sufficiently elastic to adhere and yield
to the natural action of the wood without cracking or flaking off. In
effecting one of these results we are apt to affect the other; and
nothing but the utmost care, on the part both of the manufacturer of
the essential ingredients and of the person who prepares them for
use, can insure durability.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account