A rational wages system : $b some notes on the method of paying the worker a reward for efficiency in addition to wagesAtkinson, Henry
General
A rational wages system : $b some notes on the method of paying the worker a reward for efficiency in addition to wages
Atkinson, Henry
Incentives in industry -- Great Britain; Wages -- Great Britain
It is quite possible that, if a large amount of bad work be produced,
and the worker's total production be not very high, the amount to
be deducted is greater than the amount of reward. In such a case
nothing is deducted from his day wage, and nothing is held over to be
deducted from reward earned in a later week. For instance, suppose a
worker receives a day wage of 36s. per week. Then suppose his total
production would bring him a reward of 10s., but that deductions on
account of spoiled work amounted to 8s. His wages for that week would
be 36s. + 10s. = 46s.--less 8s. = 38s. net. Now, if reward due to total
production was 6s., and spoiled work amounted to 10s., then if spoiled
work were deducted in full he would get 36s. + 6s. =42s.--less 10s. =
32s. net (namely, 4s. less than his day wage). But this is never done.
He gets his full 36s., and the 4s. is cancelled altogether. Each week
is taken entirely by itself, and the day wage for the week is always
guaranteed, whatever happens in connection with the work or the reward.
If any of the spoiled work be rectifiable, this does not interfere
with the deduction. It means that, in order to make the article pass
inspection, more work, more inspection, and more supervision, must be
done on it.
(_f_) ALLOWANCES.
It happens quite frequently that stoppages occur during the progress of
the work. For instance, the worker may have to wait for material; the
driving belt may need tightening; tools may need changing at odd times
not recorded in the instructions; metal may be hard or bad, thereby
necessitating a reduction in speed--and so on.
All these things result in a reduction in the quantity of articles
produced, and none of them is due to the fault of the operator.
In such cases the worker either clocks off or receives a day time
allowance. He clocks off when his machine is actually stopped for
fifteen minutes or more at one time. If he has several short stoppages,
the foreman adds the times together and writes a day time allowance for
the whole on the worker's operation card. If it be necessary to reduce
the speed of the machine on account of hard metal, bad material, tools
not tempered correctly, or anything that tends to lower production
without actually stopping the machine, a day time allowance is made and
written on the operation card; or in some cases the standard time is
increased, thus giving a longer time in which to do the job.
Clocking and day time allowances mean that this time is deducted from
the time on reward. For example, suppose the machine is stopped for 1
hour during a job that has the standard time of 7 hours, and suppose
the time from start to finish is 8-1/2 hours. The 1 hour is subtracted
from the 8-1/2 and is paid for at day rate, the time for the job being
calculated to be 7-1/2 hours.
If during the week there are day time allowances of 7 hours, then there
are 41 reward hours and 7 day time hours.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account