A Tour Through South AmericaForrest, A. S. (Archibald Stevenson)
History
A Tour Through South America
Forrest, A. S. (Archibald Stevenson)
South America -- Description and travel
A new railway terminus has been built. The trains which run each way,
three times daily, across the isthmus to Panama, carry passengers and
baggage to that city and to the numerous wayside stations along the
route. They are always crowded with employees of the Canal Commission,
and travellers on their way, via the Pacific port, to countries on the
western side of South America.
Along the route of the canal, which follows closely the line of the
railway, a busy scene of activity is presented. Only those who have
travelled backwards and forwards over the line many times, and have
branched off along the numerous side tracks that have been laid to carry
the excavated earth to convenient or necessary dumping grounds, can be
properly impressed with the magnitude and difficulty of the operations,
as evidenced not only by the existing works, but by continual reminders
of the French enterprise, in hundreds of disused and obsolete trucks,
engines and dredgers which lie half-sunk in deep morasses or overgrown
with dense vegetation.
The towns and villages that have sprung up along the line of the canal
have grown rapidly during the last two or three years, for although the
French had erected over two thousand buildings during their occupation,
the new owners have added so largely to that number that such towns as
Empire, Culebra, Las Cascadas, and Gatum are quite important and
considerable centres of industry, with schools, hotels, court-houses and
large dwelling houses scattered through them.
The headquarters of the Canal Commission are at Culebra, and it is here
also that the largest excavation work is going on. The hill of Culebra
(which means a “serpent”) is about thirty-six miles from Colon and ten
from Panama, and it was at this point that the two French companies
concentrated their efforts. The canal in course of construction, and now
nearing completion, is a high-level one, the amount of excavation being
considerably less than that required if De Lesseps’ original plan of a
sea-level route had been adhered to.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account