Some people imagine that if damp is in a wall the best way to get rid of
it is to seal it in, by plastering the inside and stuccoing the outside
of the wall; this is a great mistake; damp will rise higher and higher,
until it finds an outlet; rotting in the meanwhile the wood bond and
ends of all the joists. We were asked recently to advise in a curious
case of this kind at a house in Croydon. On wet days the wall (_stucco_,
outside; _plaster_, inside) was perfectly wet: bands of soft red bricks
in wall, at intervals, were the culprits. To prevent moisture rising from
the foundations, some substance that will not allow it to pass should be
used at a course or two above the footings of the walls, but it should
be below the level of the lowest joists. “Taylor’s damp course” bricks
are good, providing the air-passages in them are kept free for air to
pass through: they are allowed sometimes to get choked up with dirt.
Sheets of lead or copper have been used for that purpose, but they are
very expensive. Asphalted felt is quite as good; no damp can pass through
it. Care must, however, be taken in using it if only one wall, say a
party wall, has to be built. To lay two or three courses of slates,
bedded in cement, is a good method, providing the slates “break joint,”
and are well bedded in the cement. Workmen require watching while this
is being done, because if any opening be left for damp to rise, it will
undoubtedly do so. A better method is to build brickwork a few courses in
height with Portland cement instead of common mortar, and upon the upper
course to lay a bed of cement of about one inch in thickness; or a layer
of asphalte (providing the walls are all carried up to the same level
before the asphalte is applied hot). As moisture does not penetrate these
substances, they are excellent materials for keeping out wet; and it can
easily be seen if the mineral asphalte has been properly applied. To keep
out the damp from basement floors, lay down cement concrete 6 inches
thick, and on the top, asphalte 1 inch thick, and then lay the sleepers
and joists above; or bed the floor boards on the asphalte.
The walls and principal timbers of a building should always be left for
some time to dry after it is covered in. This drying is of the greatest
benefit to the work, particularly the drying of the walls; and it also
allows time for the timbers to get settled to their proper bearings,
which prevents after-settlements and cracks in the finished plastering.
It is sometimes said that it is useful because it allows the timber more
time to season; but when the carpenter considers that it is from the
ends of the timber that much of its moisture evaporates, he will see
the impropriety of leaving it to season after it is framed, and also
the cause of framed timbers of unseasoned wood failing at the joints
sooner than in any other place. No parts of timber require the perfect
extraction of the sap so much as those that are to be joined.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account