Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthousesStevenson, Alan
History
Account of the Skerryvore lighthouse : $b with notes on the illumination of lighthouses
Stevenson, Alan
Skerryvore Lighthouse (Hebrides, Scotland)
_a_, _a_, had, at each end, double knobs, and were pushed up along the
beams, until they squeezed the timbers _x_, _x_, _x_ between them;
plates _p_, _p_ (having holes in them through which the double knobs of
the braces were made to pass), were then put on and keyed and screwed,
as shewn in the figure, so that each beam was quite enclosed by
fixtures, which were thus independent of spikes or bolts. Thin hardwood
wedges were afterwards driven in, wherever they could be inserted
between the iron and the timber; and those wedges were “_stitched_” to
the beams with common nails, merely to prevent their dropping downward,
after any temporary contraction of the timber from the state of the
atmosphere. In all this, I have anticipated what more properly belongs
to the works of the season 1839; but I consider it best, for the sake
of clearness, to connect this account of the new with the destruction
of the old Barrack.
* * * * *
~Works at Hynish.~
While the operations already described were in progress at the Rock,
various works were going forward at the workyard in Tyree. About 16
masons, 12 quarriers, and 4 carpenters, were employed in building
the barracks for the workmen and in erecting smiths’ and carpenters’
shops. A large room, paved with a stone floor, for drawing out at
full size the courses of the Tower and making the moulds for dressing
the stones, was also provided; and a platform of squared masonry was
set in the workyard, on which the courses were to be laid, before
being shipped for the Rock. During the season, the pier had also been
carried out 256 feet, to a point 15 feet within the low-water mark. It
was also necessary to provide depositories for the security of tools
and other implements, as well as a large coal-shed for the supply of
the Steamer which was then in the course of being built. It had, as
already noticed, been determined that the stores were to be served
out at the cost prices of the Greenock market, to be paid for once
a month, at the same time that the wages of the men were paid. That
arrangement had been carried into effect on a small scale, from the
very beginning of the works; but this season it became necessary, owing
to the increased number of men, to conduct it on a more extended and
systematic plan; and, for that purpose, a person was required to act
as storekeeper and clerk. In order also to preserve the provisions
from injury by damp and to secure them from the inroads of the needy
Celts and from innumerable rats which overrun that part of Tyree, it
was found necessary to set apart, as a storehouse, a large room on the
second storey of one of the workshops. The chief articles served out in
the store were meal, molasses, sugar, coffee, tea, tobacco and butter.
The establishment of the store entailed a great deal of trouble, and
led to some expense for carriage and packages, as well as to occasional
trifling losses in serving out the allowances or from injury sustained
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account