THE MURGHAB VALLEY RAILWAY
[Illustration: STREET SCENE, ANDIJAN]
The Russian Government has shown remarkable energy during the past few
years in improving its railway communications in Central Asian regions.
After the Trans-Caspian line had been finished from the Caspian Sea to
Samarkand there was a lull in construction, but presently an extension
was carried on to Tashkent and thence to Andijan. By creating railway
communication with Merv, Russia met half-way the difficulties of her
station in Trans-Caspia. In the event of any military crisis arising
with Afghanistan 300 versts of difficult country yet remained to be
crossed before concentration upon that frontier could be effected. At
a later date, a branch was run from Merv to Pendjeh, by which this
hiatus was at once repaired and Russia secured to herself a position of
commanding importance across the road to Herat.
Surveys, carried out in the year 1894 in two directions, from the
station of Tejend and from Merv, demonstrated that the Merv-Murghab
route did not present any technical difficulties. Shorter than
the Tejend line by 65 versts and more level, it traversed the
well-populated Merv, Yulatan and Pendjeh oases. Water was also
plentiful. On the other hand the line from Tejend crossed very
difficult country; while it doubled the distance, necessitating 700,000
cubic sagenes’ additional excavation. Perhaps a more emphatic objection
arose from the inadequacy of water between Tejend and Sarakhs, supplies
in the Tejend district drying up between September and January. As a
consequence the line was constructed from Merv to Kushkinski Post,
on the Afghan frontier, through the valleys of the Murghab and Kushk
rivers, just over 293 versts or 192 miles in length, with a terminal
depôt only 80 miles distant from Herat. From motives of economy one
station was allowed to every 50 versts, with sidings half-way between
them; only two engine sheds and workshops were provided, while all
other buildings were limited and none but the cheapest materials
employed. Bridges were made of wood instead of stone, the rolling-stock
sufficing for four trains in the twenty-four hours. Railway and
military telegraph wires were fixed to the same posts and it was not
intended to ballast the permanent way. Construction was reduced by
these precautions to 8,408,000 roubles. After revision by a commission
of the General Staff this sum was increased by the cost of ballasting
the permanent way, 329,000 roubles; the total expenditure upon the work
finally amounting to 9,669,000 roubles or 33,000 roubles per verst.
Imperial ukase authorised construction on August 26, 1896, actual work
beginning on April 27, 1897.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account