Colonel Ulyanin, of the Corps of Engineers, was appointed Chief
Constructor and the overseers were also engineer officers, the majority
of whom had already taken part in the laying of the Krasnovodsk-Merv
section of the Trans-Caspian railway. The workmen consisted of
Russians, Persians, Bokharans, Sarts from the province of Samarkand,
Ersaris and Afghans from Maimana, the daily roll averaging between
3500 and 5000. Of this number from 27 per cent. to 45 per cent. were
Russians, who were paid from eighty-nine kopecks to one rouble eighty
kopecks per day. Native workmen received no more than eighty kopecks
daily; several hundred of them worked for a monthly salary of between
fifteen and seventeen roubles. The prevalence of malaria in the Kushk
and Murghab valleys interrupted the building and hundreds of instances
of labourers breaking their contracts occurred, the authorities being
obliged to repair the shortage by enlisting inexperienced men. In
spite of this difficulty work upon the permanent way was completed
in November 1898, and the task of laying the rails, which began on
November 15, 1897, was finished on December 4, 1898. Rails were laid at
a rate varying between 1 and 2½ versts per day, the job being carried
out by the newly formed companies of the Railway Battalion. The cost
per verst fluctuated from 350 to 450 roubles. The difference existing
between the gauge of this railway and the standard of the Russian
railways has since been altered. At first the line was of narrow gauge
with rails weighing 18 lbs. to the cubic foot, metals of a heavier type
only being laid for a distance of forty versts. The service of trains
from Merv to Kushkinski was opened on December 4, 1898. At the present
time, it comprises four daily local trains and two bi-weekly expresses,
“through” trains, which complete the journey in eighteen hours at a
speed of 11 miles an hour.
Upon completion and after inspection by a commission, control of the
Murghab valley line reverted to the Minister of Ways and Communications
by whom the original narrow gauge was adapted to the broad gauge of
the Russian system. Various other alterations and improvements in the
siding and hutting accommodation were also carried out. In 1901-02
branch lines to Chahil Dukteran and Tanur Sangi, skirting the left
bank of the Murghab and passing Maruchak on the Afghan bank, were
constructed. It is now proposed to double the entire track between
Merv and Kushkinski Post, these highly significant changes making the
railway available for any service the military authorities might impose
upon it. The line itself is veiled in such close secrecy by the Russian
authorities that peculiar interest attaches to any particulars upon it,
and these notes, presented for the first time to the public, convey an
accurate and not unimportant description of its character, from the
junction at Merv to the terminus at Chahil Dukteran.
[Illustration: A NOTABLE GATHERING]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account