These shell contracts were placed in December, 1917. The Michigan
Stamping Co. had to wait five months before it could secure and install
its complete equipment of machinery. It was September before all of
the difficulties in the Detroit plant's project could be overcome and
quantity production could be started. The concern eventually, before
and after the signing of the armistice, built 9,185 shell of this type
at a maximum rate of 56 per day.
Greater promise seemed to be held forth by the Metropolitan Engineering
Co.'s project to build shell of pressed-out plates, electrically
welded. The Government undertook to furnish the steel plates for this
work and secured from the American Rolling Mills Co., of Middletown,
Ohio, a total production of 6,757 tons of them. The Metropolitan
Engineering Co. had great difficulty in perfecting a proper welding
process; and the concern lost a great deal of money on the contract,
yet cheerfully continued its development without prospect of recompense
in order that we might have in this country the knowledge of how to
build such shell. In all, including production after the armistice was
signed, the Metropolitan Engineering Co. built 136,189 shell bodies of
this size at a maximum rate of 987 per day.
During the summer of 1918 a single-piece shell body of the
240-millimeter size, produced by a deep-drawing process, was worked
out. A contract for 125,000 of them was given to the Ireland & Matthews
Manufacturing Co., of Detroit, Mich. The armistice brought this
contract to an end before it had produced any shell of this new and
most promising type.
Early in 1918 we received the first samples of the 6-inch trench
mortar. By April all the plans were ready for American production.
Again this work was divided by types. The National Tube Co., of
Pittsburgh, contracted to build 510 rough forgings of mortar barrels
at its Christy Park plant. The Symington-Anderson Co. undertook to
machine these barrels. The David Lupton Sons Co. agreed to assemble the
mortars, as well as to produce the metal and timber bases for them.
The first machined barrels reached the Lupton plant in June and
found bases ready for them. But, as the assembling was in progress,
the American Expeditionary Forces cabled that the British producers
of mortars had changed their designs, and that we must suspend our
manufacture until we also could adopt the changes. The altered plans
reached us some weeks later; yet, nevertheless, we were able to make
good our original promise to deliver 48 of the 6-inch Newton-Stokes
mortars at the port of embarkation in October, 1918.
Meanwhile we had increased the contracts by an additional requirement
of 1,577 mortars of this size. The National Tube Co. eventually
reached a maximum daily production of 60 barrel forgings. The
Symington-Anderson Co. machined the barrels finally at a 33-per-day
clip. As many as 11 proof-fired guns per day came from the David Lupton
Sons Co.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account