On September 1, 1917, an order was placed with the Watertown Arsenal
for 250 carriages for the American 240's, to be turned out complete
with the recoil mechanism, transportation vehicles, tools, and
accessories. To show the size of the job, an allotment of $17,450,000
was set aside to cover the estimated expenses at the arsenal.
Well equipped as the Watertown Arsenal was said to be at the time for
the production of heavy gun carriages, it was found necessary, in
order to handle this job, to construct a new erecting shop that had a
capacity practically as large as all the other buildings of the plant
put together. The number of employees at the arsenal was increased from
1,200 to more than 3,000.
The greatest difficulty experienced was in obtaining the large number
of heavy machine tools required, and experts were sent out to scour
the country in an effort to locate these tools wherever they might
be available. Raw materials could not be procured in sufficient
quantities, while numerous transportation delays impeded the work.
Finally, in October, 1918, the pilot carriage was completed and
sufficient progress had been made on the entire contract to assure
production of the required number of units in the early part of 1919.
A second carriage contract (Nov. 16, 1917) went to the Standard Steel
Car Co., of Hammond, Ind. This called for the delivery of 964 carriages
complete with transportation vehicles, limbers, tools, etc., but not
with recuperators. These the Otis Elevator Co., of New York, undertook
to deliver.
The Standard Steel Car Co. is one of the most important builders of
railway cars, freight and passenger, in the country, and it possessed a
large and well-equipped plant. Nevertheless, the company was compelled
to construct several additional buildings and practically to double the
capacity of its huge erecting shop in order to prepare adequately for
the tremendous task undertaken.
As a means to save time, subcontracts were immediately placed with more
than 100 firms throughout the East and Middle West for the production
and machining of as many as possible of the component parts needed by
the Standard Steel Car Co. Wherever practicable, the subcontractors
working on similar contracts for the Watertown Arsenal were retained
by the Indiana company, so that better prices might be obtained, parts
standardized, and the whole production greatly facilitated.
Once the work was well under way the ramifications of this one
contract, with its subcontracts for parts, materials, tools, building
construction, etc., extended throughout practically the entire
industrial facilities of the eastern and central sections of the
country.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account