Sometimes the ground water encounters an impervious stratum as it
flows downward through the soil, or one that is less pervious than the
surface soil. When such is the case, the water will follow along this
stratum, and should there be an outcrop of the dense stratum, a spring
will be found at that place. This may be on a highway. The impervious
stratum may not actually outcrop but may lie only a few feet under the
surface of the road, in which case, the road surface will be so water
soaked as to be unstable. The so-called "seepy places" so often noted
along a road are generally the result of this condition. This
condition can be corrected by tile laid so as to intercept the flow at
a depth that precludes damage to the road. Commonly, the tile will be
laid diagonally across the road some distance above the section where
the effect of the water is noted, and will be turned parallel to the
road at the ditch line and carried under one of the side ditches to an
outlet.
=Tile Drains.=--Where the soil and climatic conditions are such that
the roadway at times becomes unstable because of underground water
rising to a level not far below the road surface, the ground water
level is lowered by means of tile underdrains. The function of the
tile drains in such cases is precisely the same as when employed in
land drainage; to lower the ground water level.
=Laying Tile.=--The tile lines are usually laid in trenches parallel
to the center line of the road near the ditch line and at least 4 feet
deep so as to keep the ground water level well down. They must be
carefully laid to line and grade. A good outlet must be provided and
the last few joints of pipe should be bell-and-spigot sewer pipe with
the joints filled with cement mortar. The opening of the tile should
be covered with a coarse screen to prevent animals from nesting in the
tile.
It is frequently necessary to lay a line of tile at the toe of the
slope in cuts to intercept water that will percolate under the road
from the banks at the sides. In some cases, it is desirable to
back-fill the tile trench with gravel or broken stone to insure rapid
penetration of surface water to the tile. In other instances, it is
advantageous to place catch basins about every three or four hundred
feet. These may be of concrete or of tile placed on end or may be
blind catch basins formed by filling a section of the trench with
broken stone. When a blind catch basin is used, the top should be
built up into a mound, and for a tile or concrete catch basin, a
grating of the beehive type should be used, so that flow to the tile
will not be obstructed by weeds and other trash that is carried to the
catch basin.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account