=Foundation for the Macadam.=--Macadam surfaces are quite generally
placed in a trench as described in the trench method for placing
gravel. It is an almost universal practice to compact the layer of
stone by rolling with an 8- or 10-ton power roller, and if the stone
is not held between substantial earth berms or shoulders, the rolling
merely serves to spread the stone out over the road bed instead of
compacting it. If an attempt is made to roll broken stone which has
been placed on a yielding foundation, no benefit results, but on the
contrary the stone is likely to be forced down into the soil. To
insure that the layer of broken stone can be compacted by rolling, it
is first necessary to roll the earth foundation until it becomes hard
and unyielding. If soft or yielding places appear during the rolling
these should be corrected by tile drains or by removing the earth from
the spongy place and back-filling with material that will compact when
rolled.
It is not always easy to determine why these soft places exist in what
appears to be a well drained roadway, especially since they are as
likely to be found on fills as anywhere else. Apparently they are due
to local pockets of porous soil held by denser soil so that the water
does not readily drain away. It is usually true that such places are
observed during the season of frequent precipitation more often than
during other seasons of the year.
In dry climates, the difficulties of securing suitable foundations for
the broken stone road are largely eliminated, but it may be observed
that this type of surface is not suitable for such climates unless
some sort of bituminous binder is employed to hold the stones in
place. The cementing power of the stone dust is inadequate when the
surface is continually dry.
[Illustration: Fig. 17.--Cross Section for Macadam]
=Telford Foundation.=--When the Telford type of foundation is
employed, the earth subgrade is prepared and then the Telford stone
placed carefully by hand. The spaces between the large stones are
filled with the spalls broken from the larger stones in fitting them
in place. When completed the base is rolled with a heavy roller to
secure a firm unyielding layer. The thickness is generally about eight
inches. Any fairly sound stone may be used for the Telford base.
=Placing the Broken Stone.=--It has been found impracticable properly
to roll a greater thickness than about 5 or 6 inches of loose stone,
therefore, the stone for the macadam surface is usually placed in two
layers, the first or lower layer being rolled before the next layer is
placed. The stone is hauled in dump wagons, trucks or dump cars,
dumped on the road bed and spread by hand rakes or by means of a blade
grader and is then rolled. To insure the proper thickness the loads
are accurately spaced to spread to the proper thickness.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account