An Account of the Bell Rock Light-House: Including the Details of the Erection and Peculiar Structure of That Edifice; to Which Is Prefixed a Historical View of the Institution and Progress of the Northern Light-HousesStevenson, Robert
History
An Account of the Bell Rock Light-House: Including the Details of the Erection and Peculiar Structure of That Edifice; to Which Is Prefixed a Historical View of the Institution and Progress of the Northern Light-Houses
Stevenson, Robert
Bell Rock Lighthouse (Scotland); Lighthouses -- Scotland
At 4 o’clock this morning the Tender reached her moorings, and was made
fast to the south-west buoy, as laid down upon Plate V. At 5 o’clock,
32 artificers and 11 seamen landed upon the Rock, from three boats.
The landing-master’s crew transported one of the cranes from on board
of the Tender, on one of the praams, and landed it at high-water upon
the Rock. Having again landed in the evening, the foundation-pit was
cleared of water by 6 o’clock, when the Crane was set up and properly
guyed with ropes. The center-stone and three others were then laid with
mortar, and trenailed to the Rock. After two hours’ work, the site of
the building was again overflowed, and at 8 o’clock the artificers
returned on board of the Tender.
[Sidenote: Advantages of the new cranes over sheer-poles.]
As the stones were all dove-tailed into one another, they required
to be laid perpendicularly into their respective places, which was
also essential to preserving a proper bed of mortar under them. This
could only be effected in a speedy and dextrous manner by means of a
crane; but it will further be seen, from the angular figure of the
stones, that this could not be effected by one of these machines of
the ordinary construction, as has formerly been noticed. It had been
recommended to the writer to use the common sheer-poles, with which
the Edystone Light-house was built, which, notwithstanding all the
improvements in machinery, were still chiefly in use for laying heavy
stones; but sheer-poles, besides being difficult to preserve on a
sunken rock, could neither have laid the materials so well, nor with
a tenth part of the expedition, as the crane with the moveable beam
delineated in Plate XIV.
[Sidenote: Mr Smeaton’s plan of Trenails and Wedges followed.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account