An Account of the Bell Rock Light-House: Including the Details of the Erection and Peculiar Structure of That Edifice; to Which Is Prefixed a Historical View of the Institution and Progress of the Northern Light-HousesStevenson, Robert
History
An Account of the Bell Rock Light-House: Including the Details of the Erection and Peculiar Structure of That Edifice; to Which Is Prefixed a Historical View of the Institution and Progress of the Northern Light-Houses
Stevenson, Robert
Bell Rock Lighthouse (Scotland); Lighthouses -- Scotland
Stones laid at the depth of about 14 feet under high-water mark,
required more than merely laying them on their respective beds, and
trusting to their own gravity. For this purpose nothing seemed to be
so well adapted as the oaken trenails which Mr Smeaton used in the
erection of the Edystone Light-house. Two jumper-holes, of an inch and
a half in diameter, had accordingly been drilled through each stone,
which were continued or perforated to the depth of six inches into the
rock or course immediately below, which became the most tedious part of
the building operation. When the oaken trenail was inserted into the
hole, it had a saw-draught across the lower end, into which a small
wedge was inserted: and when driven home, it became quite firm. The
trenail was then cut flush with the upper bed of the stone, and split
with a chisel, when another wooden wedge was inserted and driven into
the upper end of the trenail, as represented in diagram 10. of Plate
X. Nor was this all, for, in following up Mr Smeaton’s principle, two
pairs of oaken wedges, as represented in Plate X., Fig. 11. were also
driven gently into the perpendicular joints, prior to grouting them
with mortar. The whole stones of a course had thus to be laid with
great nicety, corresponding to a number of checks and marks, previously
arranged in the work-yard, that the wedges might fit without trouble at
the Rock, and preserve the respective positions of the superincumbent
courses, and make band throughout the whole fabric.
[Sidenote: Friday, 5th.]
[Sidenote: 16 Stones laid.]
The boats landed the artificers this morning at half-past 5 o’clock,
and the foundation-pit being cleared of water, seven stones were laid
and secured with trenails by 8 o’clock. The artificers are again landed
at 6 P. M. and in the course of two hours nine additional stones were
laid.
[Sidenote: Saturday, 6th, till Wednesday, 10th.]
[Sidenote: 92 Stones laid.]
From Saturday the 6th till Wednesday the 10th inclusive, the weather
and tides were favourable, which afforded an opportunity of landing
both with the morning and evening tides, and in the course of these
five days twenty-six hours’ work were obtained, and ninety-two stones
were laid. The landing-master’s crew also continued their operations in
delivering the Smeaton, and laying her cargoes on the Rock.
[Sidenote: Thursday, 11th.]
[Sidenote: 11 Stones laid.]
The boats landed the artificers to-day at 9 A. M., and in about three
quarters of an hour the site of the building was cleared of water, when
eleven stones were laid in the course of an hour and three quarters.
There being a considerable swell in the sea to-day from south-east, the
praams could not land any materials upon the Rock at high-water, and
nothing could be done in this way at low-water, as the Railways were
not yet in a working condition.
[Sidenote: A party of Gentlemen narrowly escape being drowned.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account