During the remainder of this month, no opportunity occurred for landing
on the Rock, but the other departments of the service went forward with
all possible dispatch. The Thirteenth course was nearly completed,
and a part of the Fourteenth had been laid on the platform. The last
of the moulds for the granite stones, to the height of 30 feet, had
now been sent to the quarries of Aberdeen and Peterhead, where the
Smeaton, and the hired sloop Alexander, were each loading a cargo. Mr
Peter Logan had now left the quarries at Peterhead, where he had been
for some months; and Alexander Davidson, one of the principal granite
masons, appointed to attend the quarries at Aberdeen, was also soon to
be removed from that station, to perform the same duty at the sandstone
quarry of Mylnefield. Measures had likewise been taken for providing
the necessary castings for the extension of the Railways to the western
landing place at the Rock, which altogether were to include a range of
about 800 feet.
[Sidenote: Cast-iron Mushroom Anchors. Difficulty in procuring
Trenails.]
The uncertainty attending the fixing of the malleable iron shank into
the large cast-iron head of the mushroom anchor, represented in Plate
X. Fig. 4., from its liability to shake loose, had induced the writer
to make trial of a mushroom anchor, made wholly of cast-iron, which was
finished in a very complete manner by the Shotts Iron Company. At the
same works, castings were also made for a set of new sheers for those
broken in the month of September at the eastern landing creek, which
answered all the purposes of a crane, as represented in Plate XI. The
two new praam-boats building at Arbroath, had advanced considerably
in the course of this month, and were now ready for the laying of the
decks. Of all the materials connected with those which may be termed
of a trifling nature, none was more difficult to be procured than the
oaken trenails, for fixing the stones of the lower or solid part of
the building while the work was in progress. After much correspondence
with London and other ports, a considerable quantity was procured from
trenail merchants of Wapping. But such was the demand for oak timber
at this period, owing to the great supply wanted for the Navy, that it
was not only at a considerable expence, from about L. 3 to L. 5 per
hundred, but with great difficulty, that trenails of the dimensions
wanted could be collected. It was found by a calculation, at this
time, that 2544 trenails, from 20 to 26 inches in length, and 1¼
inches in diameter, and 3720 pairs of wedges, from 15 to 19 inches in
length, 3 inches in breadth, and 1 inch in thickness at the top, would
still be wanted. Fortunately, however, a great quantity of oak timber,
suitable for trenails, was brought about this time from the Highland
districts to Perth, for making the spokes of carriage-wheels. A supply
of these was accordingly got, at a much cheaper rate than the ordinary
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account