trenails of the carpenter, and which were also considered better for
the purposes of the work.
[Sidenote: Purchase of the Sloop Patriot.]
In order that the building operations at the Rock might suffer as
little delay as possible, from the difficulty attending the regular
transportation of the stones from Arbroath, and also to provide
against the numerous accidents to which the vessels in this service
were incident, it was judged proper to have another vessel besides the
Smeaton for this department of the service. The writer consequently
corresponded with various ports, with a view to procure a vessel of
about 40 tons burden, or nearly the size of the Smeaton. Two vessels of
this description were offered for sale, at the same price of L. 470;
but one of them, the sloop Patriot of Kirkaldy, was stated to be a new
vessel, which had hardly been at sea, while the other was several years
old; the Kirkaldy vessel was therefore preferred.
[Sidenote: 1809, April.]
On the 5th and 6th April, the boats of the Floating-light landed the
artificers on the Bell Rock at 11 o’clock A. M., and they remained till
1, having had two hours’ work each tide in refitting the railways, and
setting up the bracing-chains of the Beacon, which were still found
in a loose state. Notwithstanding all the precautions used, one of
them had unscrewed its nut to the extent of 3 inches, by the friction
arising from the agitation of the sea, but every thing else was found
to be in good order.
[Sidenote: Floating-light encounters some heavy seas.]
From the 6th to the 20th, the weather was particularly boisterous,
the winds being chiefly from the eastward, with occasional showers
of snow. On the 16th it was found necessary to veer out the cable of
the Floating-light from the 30th to the 90th fathom service; and, on
the 17th, at 2 o’clock A. M., she had shipped so heavy a sea, that it
filled both of the boats amid-ships, and ran down the companion and
hatches in such quantities as to give great alarm to all on board,
who, for a time, concluded that the vessel was sinking.
[Sidenote: Twelfth course completed by the Stone-cutters.]
About the beginning of this month, the stone-cutters in the workyard
had just completed the hewing of the sandstone or hearting of the
Fourteenth course of the building: but those employed at the granite
blocks of the course were at a stand, both with that and the Thirteenth
course, for want of materials: a supply, however, having timeously
arrived from Aberdeen and Peterhead, these courses were proceeded with,
though, as yet, none higher than the Twelfth was in a finished state.
As the sandstone masons were considerably ahead of those who wrought
the granite, the former were chiefly employed in laying the courses on
the platform, and boring the trenail holes. The necessary implements
were also prepared, and in readiness for shipping for the Rock, with 62
barrels of lime, 78 barrels of pozzolano, and 60 barrels of sand.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account