_General._--The roof of the reservoir has been laid out as a garden, and
the embankments are turfed. The intention is to develop the Company's
land as a public park, as it commands fine views of the city and the
surrounding mountains. An inspector's house has been built, and a
private telephone line provides for communication with the Estanzuela
intake and also with the general offices in the city.
[Illustration: PLATE XVIII, FIG. 1.--VIEW OF SOUTH RESERVOIR, LOOKING
TOWARD THE CITY.]
SAN GERONIMO GRAVITY SUPPLY.
_Provisional Supply._--It has already been stated that the Company began
operations at San Geronimo in March, 1906, by sinking a well on the
north bank of the Santa Catarina River at San Geronimo. At this point, a
little later, a small steam pumping plant, sufficient to handle about
8,000 liters per min., was installed. The lowest depth to which this
well was ultimately sunk in water-bearing strata, was 7 m., the normal
level of the water during 1906 and 1907 never falling lower than 569 m.
above datum. Tests made from time to time during 1907-08, showed that
this well was capable of supplying nearly 10,000,000 liters (264,000
gal.) of water daily.
The excellent supply yielded by this well made it desirable to adopt it
immediately as a provisional measure, pending the completion of the
larger works forming the western source of supply. To utilize the well
to its fullest extent, a reinforced concrete reservoir, of 3,000,000
liters capacity, was constructed on the south bank of the river, the top
water level being 585 m. above datum, that is, at the same elevation as
the proposed reservoir for the Estanzuela supply. The reservoir is 53.80
m. long, 21 m. wide, and has a water depth of 3.25 m. at the overflow
level. It is excavated on a steep hill slope, and has an earth
embankment on the lower side. The lining is of concrete, 20 cm. thick,
and the roof is of reinforced concrete composed of flat arches springing
from beams carried on 46 by 35-cm. reinforced columns. There are 68 of
these columns, and they are 3 m. apart longitudinally and 5 m. apart
transversely. The roof was not constructed until October and November,
1907, and prior to that time the necessity of covering the reservoir was
amply demonstrated by the growth, during hot weather, of considerable
quantities of green algae, which had to be skimmed from the surface of
the reservoir every few days.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account