The house connections are chiefly of 10-cm. (4-in.) pipes, laid on a
minimum gradient of 2-1/2%, from oblique branches on the sewer to siphon
intercepting traps near the house, as shown by Fig. 17. From this trap a
10-cm. fire-clay inspection pipe is carried up and capped at the sidewalk
level with a cast-iron box having a locked cover. From this inspection
pipe a branch is connected to a cast-iron fresh-air inlet, in most cases
set in the wall of the house, the inlet being 30 cm. above the level of
the pavement.
_Effect of the Flood on Sewers._--The flood of August 27th and 28th, 1909,
partly destroyed one of the main collectors, which was laid along the
banks of the river and encased in concrete. This has now been relaid
farther north, and out of the way of any future floods. The total length
of the new sewers replacing those damaged amounts to 1200 m., and they
vary in internal diameter from 20 to 55.9 cm. (8 to 22 in.).
MAIN OUTFALL SEWER.
The direction of the main outfall sewer was determined after a thorough
study of all the available land lying to the north and northeast of the
city, as it was the intention of the Company to utilize for irrigation
purposes the sewage and any surplus waters that might be developed. The
best available site was found to be about 12 km. north of the city, a
little northwest of the village of San Nicolas de los Garzas, as shown on
Plate II. The long length of outfall required was justified by the cheap
cost of the land and its excellent character for sewage irrigation. The
sewer was designed for a capacity of 90,000,000 liters a day (36.76 cu.
ft. per sec.) in order to allow for conveying surplus waters as well as
sewage.
[Illustration: PLATE XXII.--OUTFALL SEWER: PLAN OF GROUND SHOWING SEWER;
ALSO DETAILS OF VARIOUS SECTIONS.]
The outfall intercepts the two main branches of the city sewers at Calle
de Allende and Calle de Tapia, and its total length is approximately
11,900 m. The chief type adopted is shown on Plate XXII. It is formed
with an invert of radial bricks laid in 1:2 cement mortar, on a foundation
of 1:3:5 concrete approximately 7 cm. thick. As the ground was chiefly in
hard sillar, only a little concrete was required to mould the bottom to
the correct shape. The arch was formed of special radial bricks, 15 cm. (6
in.) deep, laid in cement mortar. These bricks were adopted in preference
to concrete, owing to the heavy cost of sand and rock, due to the long
haul, and for the purpose of obtaining rapid work. Plate XXI shows the
sewer arch, and one of the ventilating columns and manholes. The bricks
were obtained from the local brick plant, and form a very satisfactory
material for sewers, being well burnt, thoroughly hard, and absorbing not
more than 7-1/2% of their weight of water. The contract prices for the
labor on the brickwork were 1.25 pesos per sq. m., and 1.38 pesos for the
arch.
[Illustration: PLATE XXI, FIG. 1.--VIEW OF ARCH, OUTFALL SEWER.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account