[Illustration: PLATE XXI, FIG. 2.--VENTILATING COLUMN AND MANHOLE, OUTFALL
SEWER.]
The general route of the sewer is very direct, long straight lines of
several kilometers being possible, and these were joined by curves of
approximately 30 m. radius. The gradient of the sewer invert is 0.2% (1 in
500) which is approximately the general fall of the ground northward from
Monterrey.
The total quantity of excavation was as follows:
No. 1, soft earth 8,960 cu. m.
No. 2, sillar 18,492 " "
No. 3, conglomerate rock 9,822 " "
------
Total 37,274 cu. m.
The contract prices for this excavation were: for No. 1, 32 cents; No. 2,
85 cents; and No. 3, 2.17 pesos per cu. m.
All the excavation was in perfectly dry ground. Where the sewer was partly
out of the ground it had a foundation of concrete, 1.75 m. wide, from 15
to 23 cm. thick, below the bottom of the brickwork, and carried up to the
springing of the arch, and a well-tamped embankment, with slopes of 1-1/2
to 1, to protect the sewer to a height of 30 cm. (12 in.) above the arch.
For 342 m. at the Monterrey end of the line, the sewer was constructed in
tunnel, from, the open end and from two intermediate shafts. The tunnel
throughout was in sillar, and the contract price for excavation was 24.50
pesos per lin. m. This work was done without timbering of any kind, except
at the shaft lengths. Plate XXII shows the lining of the tunnel, which
was of concrete with a brick invert. At four places the sewer passes under
main railway tracks, which at these points were carried on steel girders
supported on concrete abutments, the sewer being carried under the tracks
in the ordinary way.
_Bridges._--At three points the sewer was carried over arroyos on
reinforced concrete girders. No. 1, at Station 5,600, consisted of four
10-m. spans; No. 2, at Station 8,365, over the Estanscia Arroyo, consisted
of nine 10-m. spans; and No. 3, at Station 8,960, over the Topo Chico
Arroyo, consisted of three 10-m. spans. One of these bridges is shown on
Plate XXIII. They were designed as two parallel continuous girders with
connecting top and bottom slabs. The concrete for the girders was a
1:2-1/2:3-1/2 mixture, the sand being from the crusher and the rock gauged
to pass a 19-mm. (3/4-in.) screen. The inside was rendered with a coat of
1:1 cement mortar, 7 mm. thick, for water-tightness.
[Illustration: PLATE XXIII, FIG. 1.--FORMS FOR MAIN GIRDERS, ESTANSCIA
BRIDGE, OUTFALL SEWER.]
[Illustration: PLATE XXIII, FIG. 2.--VIEW OF ESTANSCIA BRIDGE, COMPLETED.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account