From the screen chamber there are two main channels, 1.22 m. wide,
branching to the two concrete detritus chambers. Each channel has a square
penstock, so that the sewage can be diverted into either chamber when
necessary.
The detritus chambers are octagonal in plan, 4 m. in diameter, and each is
provided with an outlet weir 1.50 m. wide. At the weir level the chambers
have a depth of 1.75 m., with drainage channels below that level. The
coping is 1 m. above the outlet weir of the detritus tanks. To drain off
these chambers, each has a scour-out pipe, 30 cm. in diameter, controlled
from valves with spindles carried above the coping level. Each of these
pipes is connected to a central chamber, and leads to a 56-cm. (22-in.)
sludge-pipe. The chambers as designed are of smaller capacity than those
usually provided, but, as all surface water is strictly excluded from the
sewerage system, the quantity of detritus reaching the chambers may be
small. The velocity through them when both are in use will be
approximately 0.082 m. (0.27 ft.) per sec.
From these chambers the sewage is carried to the three liquefying tanks by
a main channel, 11.5 m. long and 1.50 m. wide.
[Illustration: PLATE XXVII, FIG. 1.--CAST CONCRETE BEAMS BEING PLACED IN
POSITION, LIQUEFYING TANKS.]
[Illustration: PLATE XXVII, FIG. 2.--INLET WEIRS TO LIQUEFYING TANKS,
DURING CONSTRUCTION.]
[Illustration: PLATE XXVIII, FIG. 1.--VIEW OF LIQUEFYING TANKS, FROM INLET
END.]
The tanks are of concrete and have reinforced concrete roofs. Each is 66
m. long and 6 m. wide; the minimum depth for the sewage is 1.50 m. at the
outlet end, and 2.25 m. at the inlet, increasing to a maximum depth of
2.75 m. at the lowest depth at the scour-out channel. Their combined
capacity is 2,500,000 liters, which is equivalent to 6 hours' flow of the
quantity of sewage for which they were designed. The sewage passes from
the main channel, through penstock-valves which control the flow, into one
or the other of the tanks. From these valve openings it flows over
concrete weirs, 5 m. long, and is deflected to the bottom of the tank by a
reinforced concrete scum-plate, extending across each tank, with a
clearance of 15 cm. at each end. This scum-plate is 1.5 m. deep and 10 cm.
thick, and is placed 40 cm. from the end walls.
[Illustration: PLATE XXIX.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS; DETAILS OF OUTLET CHANNELS AND WEIR BOX.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account