ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.Conway, G. R. G. (George Robert Graham)
Science
ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.
Samuel M. Gray, M. Am. Soc. C. E., acting in the interest of some American
capitalists (who had been induced by Col. J. A. Robertson, of Monterrey,
to look into the merits of a concession acquired by him, for building
these works), being guided by the Government's proposition to supply the
city with water by damming the flood-waters of the Santa Catarina River in
the narrow gorge through which the stream emerges from the Sierras, some
eight miles from the city, had several soundings made and reservoir sites
surveyed in the first two box canons up the river, and prepared and
presented to the Government several alternative projects, besides the one
mentioned by Mr. Schuyler. Several different dam sites were designated by
Mr. Gray, whose investigations extended over some two years, and were
finally abandoned after he had designed the general outlay for a complete
network of water mains and sewers for the city, on account of the
unwillingness of the Government at that time, about 1897, to grant any
guaranties as to bonds or income to the concessionaire or his assigns. Mr.
Gray did not favor the general scheme of storing flood-waters as a water
supply, but strongly recommended to the attention of the Government the
greater advantages of deriving the supply from subterranean flow in the
river, by an infiltration gallery driven into the water-bearing gravels in
the Santa Catarina Canon (only a short distance above the place where Mr.
Binckley afterward established his bore-holes across the river). He
proposed to take advantage of the steep slope of the river at a turn in
the canon, and from the lower end drive a tunnel through a projecting rock
spur, which tunnel, though starting well above the ordinary reach of
floods, would terminate in water-bearing gravel, at a sufficient depth
below the surface of the river-bed to intercept part of the underflow. Mr.
Gray, through investigations made under his direction, by Nathaniel
Turner, M. Am. Soc. C. E., had ascertained that there was an abundant
subterranean flow, and work had actually been started on the proposed
tunnel.
The results of Mr. Gray's investigations were put at the disposal of
Messrs. Mackenzie, Mann & Co. by Mr. Robertson, at whose offices Mr.
Binckley prepared the first plans submitted by him for the approval of the
Government.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account