Both the sappers and working parties are divided into reliefs, usually
of eight hours. The sappers of the tracing parties superintend the
work of the first relief of the working party, but are relieved long
enough before them (½ hour to 1 hour) for the second relief to become
acquainted with the details of its sections before the second relief of
the working party arrives. A similar arrangement is made for the third
relief.
EXECUTION OF PARALLELS AND APPROACHES.
=17.= =Simple Trench.=--A trench made by excavating the earth
and forming a parapet without revetment of any kind is known as a
“_simple trench_,” or as “_simple trench-work_.”
_Flying sap_ or _flying trench-work_.--When, in order to obtain cover
more quickly, gabions are used to hold the earth first excavated,
and subsequently to serve as a revetment to the interior slope of
the parapet, the trench is known as a “_flying sap_” or “_flying
trench-work_.”
=18.= =Construction by Simple Trench.=--The first parallel
and the distant approaches are usually constructed by the use of the
simple trench, as follows, viz. (Pl. I, Figs. 9 and 10): The men
having been posted along the tracing-tape at five-foot intervals, as
previously described, and their positions verified by the engineer
officers, the command “Commence work” is given. Each man marks the left
and front of his task by a line dug with his pick, and, commencing at
the left of his task, at once excavates a trench 3 feet long, 1½ feet
deep, and 6½ feet wide, throwing the earth to the front, and making a
parapet 1½ feet high, leaving a berm of 1½ feet. Then, commencing at
1½ feet from the front of his trench, he deepens it to 4 feet, making
the parapet 3 feet high. When the task of a party is finished each man
cleans off his pick and shovel, places them at the rear of the trench,
and leaves them there for the use of the second relief.
By excavating in this way, partial cover while at work and a defensible
parapet are rapidly obtained, and, at the completion of the task, the
parapet admits of a strong defence, and affords cover sufficient to
allow the first relief to be withdrawn and the second to be posted
without exposure. Special care must be taken during the work to make
the men face toward the parapet while digging, in order to avoid
striking their neighbors with the pick when raising it for a blow.
The second relief widens the trench 4 feet; forms a bottom step 18
inches wide with such materials as are available; heightens the parapet
to 4½ feet, and throws the rest of the earth to the front to thicken it
(Pl. I, Fig. 8).
The third relief widens the trench 2½ feet at the bottom and slopes
off the reverse as steep as the earth will stand. The earth is used to
thicken the parapet, additional shovels and shovellers being provided
if found necessary.
The approaches (Pl. VIII, Fig. 82) are extended in a similar manner;
the tasks of the reliefs are marked on the sections.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account