In traversing a double sap by change of direction, a single sap is
broken out to the right or left (or one in each direction) and pushed
forward to the desired length. From the flank of this the double sap
is again broken out and driven to the front until another traverse is
required. When the saps are driven to both right and left a double sap
is driven to the front from the extremity of each, and at the next
change of direction the single saps are driven towards each other until
they meet, and the double sap is driven in the prolongation of its
original direction. This forms what is called a _cube traverse_, and
gives additional room in the communications. The single sap is used in
making traverses, since by throwing all the earth on one side better
cover is given. When the sap is so far advanced that it becomes subject
to a reverse fire the double sap will have to be used in making the
traverses.
_Length of Traverses._--Traverses should extend at least 12 feet beyond
the trench in their rear, which will give them a length of from 25 to
30 feet on the berm. The salient angles of the sides of the trenches
should be rounded as much as practicable to allow the easy passage
of guns, and those of the parapets should, when necessary to screen
the trench, be held as nearly vertical as practicable by sand-bags.
Ramps leading to the surface of the ground may be made in rear of
the traverses when needed. For guns they are 8' wide, with slope not
greater than 1/4. The work in making traverses being considerable, they
should be spaced as far apart as practicable.
_Spacing Traverses._--In driving the sap to the front the low head
parapet of the sap will defilade a less length in the rear than would
the finished parapet of the traverse, which is from 2 to 3 feet higher.
The sap is, nevertheless, pushed forward to as great a length as will
be defiladed by the traverse when finished, the sappers meanwhile
passing the partly protected portion by stooping or creeping when
necessary.
=35.= =Traverse by Blinded Sap.=--In traversing a sap by
blinding a part of its length (Pl. III, Figs. 32-35) the sap is
first deepened 2 feet over this part; mine-cases, frames similar
to mining-frames, or regular blindage-frames (see Military Mining,
Arts. 53-55) are then put in position, the side slopes are held up
by sheeting, when necessary, and the top is covered with sheeting,
fascines, rails, or other material; earth is then thrown upon the top
to bring it up to the desired height for a traverse, which will usually
give at least 3 feet of earth covering. When a considerable thickness
of earth is to be used the frames must be made correspondingly strong.
For a clear opening, 6 feet at bottom, 8 feet at top, and 6' 6" high
the English engineers recommend frames at 3-foot intervals, with 6-inch
square posts, 2-inch thick sills, and 9 inch × 6 inch caps 12 feet
long. The end frames should be braced against outward thrust by 6" × 6"
struts.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account