Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military AcademyMercur, James
History
Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military Academy
Mercur, James
Defensive (Military science); Military engineering; Offensive (Military science); Siege warfare
_The Rear-trench Party._--This party excavates to a width of 7' 6" the
rear trench and the communications with the parallel or approach. Each
digger has a task 4' wide, 7' 6" long, and 3' 6" deep. The two directly
in rear of each gun portion throw the earth to the rear, the others
throw it to the front, leaving a berm of 4' 6" at the rear of the
traverse. The men of the _reserve_ who are not otherwise occupied fill
sand-bags from the earth thrown to the rear, and cut a ramp 8 feet wide
and not steeper than 1/4, in rear of each gun-portion, when needed. It
is essential that the excavation of the gun-portion be finished by the
first relief, so that the platforms may be laid by the second relief in
time to allow the guns to be placed before daylight.
The first relief leaves in the battery the tools required by the second
and carries the rest back to the depot.
_The second relief_ is divided into three parties and a strong reserve
of one quarter or one fifth of its strength. The first, or _front-ditch
party_, works in the front ditch, widening it 6 feet and throwing the
earth back to form the front of the parapet. The shovellers, one to
each two diggers, spread and level it. The task of a digger is 5' wide,
6' long, and 3' 6" deep.
The second, or _platform party_, places the platforms and gives way to
the gun detachments.
The third, or _rear-trench party_, widens the trench 3' towards the
front by cutting off the rear of the traverses.
The _reserve_ completes any work left unfinished by the first relief,
fills sand-bags and places them around the gun portions, digs ditches
and drainage-pits when needed, and does any other work necessary for
the completion and arming of the battery.
When a tramway is laid in the trench for bringing up the guns and
carriages, the ramps in rear need not be cut.
=51.= =Alternative Construction in Position Very Much
Exposed.=--When the earth thrown up in making the splinter-proofs
cannot be concealed, it may attract such a severe fire from the defence
as to make the above-described construction impossible. In this case
the battery is traced as above described, the balks for covering the
splinter-proofs are placed in position resting on bearing-planks, and
the construction of the front ditch, gun portions, and rear trench
are commenced at once; and the battery is as nearly finished as time
allows, and armed if possible. The splinter-proofs are subsequently
mined out and the remaining necessary details finished before opening
fire.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account