Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military AcademyMercur, James
History
Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military Academy
Mercur, James
Defensive (Military science); Military engineering; Offensive (Military science); Siege warfare
=44. Sinking a Shaft with Cases.=--(Pl. XII, Figs. 26 and 27.)--A
case of the required size is put together and accurately placed upon
the site of the shaft, whose dimensions are marked upon the ground
outside it. The case is then removed and the earth excavated to the
depth of the case, which is placed in the excavation with its top flush
with the surface of the ground. Its position is carefully verified, and
it is secured in position by packing earth around it. The excavation is
then continued for the depth of another case, which is put in place as
follows, viz.:
One end piece is placed in position, the tenons of the two side pieces
are inserted in the mortises at its ends, and the side pieces are
pushed back into position; a pocket-shaped excavation is made with a
push-pick beyond the end of one of the side pieces and running back
three or four inches into the side wall; the remaining end piece is
inserted in this far enough to allow the mortise at its other end to
slip over its corresponding tenon; it is then drawn back, and the
tenons at both ends fitted into their mortises. The notches cut in the
sides of the pieces allow them to be easily handled.
The next case is placed in the same way, care being taken not to
excavate two consecutive pockets at the same angle.
When practicable, it is well to fill up these pockets by stuffing in
sods from below before placing the next case.
Some miners prefer to place one tenoned piece first, then the two
mortised pieces, leaving a wedge-shaped opening behind one of them, and
insert the other tenoned piece last, drawing the mortised piece forward
upon its tenon.
When the sides of the cases are tenoned at one end only and secured by
wedges at the other, they are easily placed in position without cutting
out behind them.
=45.= Upon reaching the level of the top of the gallery, the
pieces on the gallery side of the shaft are omitted if the ground is
firm, but if it needs support these pieces are put in place and secured
by cleats or braces, but the tenons are not inserted in the mortises.
=46. Driving a Gallery with Cases= (Pl. XII, Fig. 27).--This is
practicable only when the soil is somewhat firm. In breaking out from
the side of the shaft, a frame is first placed inside the shaft to
support the ends of the shaft cases resting against the pieces which
are to be removed. The latter pieces are then taken out and grooves
are cut in the earth for the ground-sill, stanchions, and cap-sill of
the gallery, and these are put in place in a manner entirely analogous
to that described for sinking a shaft. This case is set flush with
the inside of the shaft and supports the side pieces, whose tenons
rest upon its stanchions. The projecting earth is then cut away and
grooves are cut for the next case, which is placed in position and the
excavation continued as before.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account