Bailey's Dam (La.); Military engineering -- United States; United States -- History -- Civil War, 1861-1865
The evidence from modern archaeological excavations generally supports
the historical accounts with some interesting variations. Both lines of
evidence testify to the ingenuity of Lieutenant Colonel Bailey. The
excavations revealed that the crib framework was constructed of hand
hewn 4-by-10-inch timbers, which is strong evidence that the lumber was
from nearby buildings. The ends of these timbers were notched so that
they fit tightly together at the corners of the cribs. The corners were
supported by smaller vertical wood posts. However, in the cribs
excavated by the archaeologists, there was no evidence of the iron
support bars. Furthermore, there was no evidence of machinery parts in
the cribs. Instead, they found that the cribs were filled mostly with
sand and mud and only capped with a layer of loose brick and stone. A
metal fragment of a large sugar kettle was also found among this brick
and stone. A sugar kettle was just the kind of loose but heavy object
that could be quickly transported to the cribs for anchoring material.
On the east (Pineville) bank, there were no town buildings to strip for
lumber but there was, quite conveniently, a forest. With abundant trees
available, Bailey constructed a “self-loading” tree dam. According to
historical diagrams, trees were stacked lengthwise with the flow of the
stream. The upstream treetops were anchored to the river bottom with
stones. The downstream trunks were raised higher than the upstream tops
by alternating layers of other logs running perpendicular to, or across,
the stream. This technique presented a dam face of logs angled upward
with the stream flow. As the river was held back by the log face, the
water pressure actually made the dam stronger or “self-loading.”
[Illustration: Sketch of tree dam which accompanied Colonel Bailey’s
report (U.S. War Department 1891-1895:Plate 53-3).]
The archaeological investigation of the tree dam was completed in a
manner similar to the excavations at the crib structures. But here a
trench excavation unit was dug. This trench was 22 feet long and 5 feet
wide, and it was positioned parallel to the flow of the river. During
these investigations, the river began to rise, and when the excavation
unit was finally abandoned, the archaeologists were working about 2 feet
below the water level. The field crew was successful in reaching that
depth only with the aid of a water pump. Archaeologists had hoped to
excavate a slice of the dam completely down to its base, but attempts to
excavate deeper were halted when the pump could not keep out the
incoming water.
[Illustration: Archaeologist David Kelley drawing map of logs
uncovered during the tree dam excavation.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account