Bell's Cathedrals: The Abbey Church of Tewkesbury: with some Account of the Priory Church of Deerhurst Gloucestershire — John Shaqi
Bell's Cathedrals: The Abbey Church of Tewkesbury: with some Account of the Priory Church of Deerhurst GloucestershireMassé, H. J. L. J. (Henri Jean Louis Joseph)
History
Bell's Cathedrals: The Abbey Church of Tewkesbury: with some Account of the Priory Church of Deerhurst Gloucestershire
In 1593 the Corporation records state that the long roof was taken
down, and replaced in the following year. Six years later there is
another interesting entry as follows: "The churchwardens after
Michaelmas, intending of themselves to build a battlement upon the top
of the church tower, offered to do the same without any charge, and
for that purpose did set forth three stage-plays, played in the Abbey
at Whitsuntide following."
To raise more money they then proposed to hold a Church Ale, but there
were difficulties in the way, and the proposal was dropped.
The cost of the battlements was £66. These same churchwardens, with
the help of others, "joined in entreating the benevolence of the best
disposed of the inhabitants, and thereby finished the free school by
glazing the windows, boarding the floors, and making the galleries."
In 1602 the monks' stalls, which had been in the body of the church,
were removed into the chancel.
In 1603 "the roof of lead over the chancel was taken down, new framed,
laid lower, and covered new," at the expense of the town.
In 1607 a large grey marble slab was discovered buried in the church.
It measured 13 feet 8 inches by 3 feet 6 inches, and 7 inches thick.
This was placed for some time in the middle of the chancel and was
used for a Communion table.
[Illustration: THE DETACHED BELL-TOWER, DEMOLISHED IN 1817.
_From Bennett's "Tewkesbury" lent by Mr. S. Browett._]
In 1653-54 there is an interesting entry in the churchwardens'
accounts: "Item. Paid the ringers 24th December, my Lord Protector
being proclaimed that day--who was the Grand Rebel." (The last few
words are by a different hand, perhaps that of the other
churchwarden.)
In 1661 the west window was blown in, and was rebuilt in 1686.
In 1720 the external re-roofing of the nave was carried out, and the
western gable, occupying the space between the two western turrets,
disappeared in the process.
By 1720 the "long roof," repaired in 1593, was again in want of
repair, and to raise money a brief was granted by Parker, the Lord
Chancellor. During the years 1723-26 the work was carried out and
finished. Before this, the eaves of the roof overlapped the side walls
of the nave.
In 1726 the "old wall at the East end of the Chancel" was taken down,
and foundations were dug upon which an altar-piece was to be erected.
About the same time, the marble Communion table, which Mr. Gough
called "the finest Communion table in the kingdom," was moved into the
nave. It was then cut longitudinally into two pieces, which were used
as seats in the porch.
In 1737 the organ now in the choir was erected over the old screen.
A stone altar-piece, Doric in character, with an elliptical pediment,
was set up in 1725, the cost being partly met by private
subscriptions. It must have struck most people as incongruous, for it
was not liked, and in 1848 it was removed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account