Soon after Dean Peacock came to Ely he commenced the restoration and
decoration of the fabric which have gone on continuously to the present
time, and are not yet complete. Besides many munificent gifts, of which
the cost is not known, upwards of L70,000 has been expended upon the
works at the cathedral since 1843. The first great work included in this
sum was the entire re-leading of the roof. In 1842 there had been a fire
discovered in the roof near the west tower, but no great damage was
done. Most likely it was the prospect of having to spend large sums upon
the cathedral itself that induced the dean and chapter to sanction the
demolition of the sextry-barn, "on the ground that the repairs it
required were too expensive." This barn was situated to the north of the
lady-chapel. It was an object of the greatest architectural interest,
and its destruction is much to be lamented. It was of Early English
date, and is said to have been a "noble and almost unrivalled" building.
It seems to have been of the same character as the abbey tithe-barn at
Peterborough, which was perfect a very few years ago, and of which the
whole of the wooden posts and beams are still to be seen _in situ_. The
Peterborough barn was also of thirteenth century date; it had aisles and
nave all formed by the oak beams and supports. The Ely barn was much
smaller.
In July, 1845, the restoration had been well begun, and was being
carried on with energy. The works in Bishop Alcock's chapel had been
commenced. The south end of the west transept, hitherto used as a kind
of storehouse or lumber-room, was repaired and thrown open to the
church. A poor deal roof was added as a temporary protection. The choir
roof was scraped and cleaned. In the lady-chapel the colour-wash that
had obscured the remains of the beautiful carvings was removed. The west
tower was ceiled. Up to this time there appears to have been no properly
qualified architect in charge of the work. In 1847 Mr. Scott (afterwards
Sir G. G. Scott) was appointed architect to the cathedral. He soon made
an extensive examination of the whole building, and issued a report upon
the state of the fabric and the amount of restoration needful.
Dean Peacock, who so thoroughly identified himself with the restoration,
died in 1858. His successor, Dean Goodwin, entered with enthusiasm upon
the work, and was instrumental in raising large sums of money for the
carrying out of the architect's designs. After he had been dean seven
years he published a paper upon the progress that had been made, which
commences with these words: "The time seems to be now come, when the
completion of the great work of restoration, commenced under Dean
Peacock, and guided for many years by his care and judgment, may be
looked upon as within reach."[29] In this paper he enumerated these
works as already accomplished:
1. The choir restored and rearranged.
2. Central lantern restored (Peacock Memorial).
3. South-east transept restored.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account