Engineers -- Fiction; Grain elevators -- Design and construction -- Fiction; Psychological fiction
CALUMET "K"
BY MERWIN-WEBSTER
AUTHORS OF "THE SHORT LINE WAR," ETC.
New York
THE MACMILLAN COMPANY
LONDON: MACMILLAN & CO., Ltd.
1904
_All rights reserved_
Copyright, 1901,
By THE CURTIS PUBLISHING COMPANY.
Copyright, 1901,
By THE MACMILLAN COMPANY.
Set up, electrotyped, and published October, 1901. Reprinted
August, 1902; March, 1903.
Special edition May, June, 1904.
Norwood Press
J. S. Cushing & Co.--Berwick & Smith Co.
Norwood, Mass., U.S.A.
CALUMET "K"
CHAPTER I
The contract for the two million bushel grain elevator, Calumet K, had
been let to MacBride & Company, of Minneapolis, in January, but the
superstructure was not begun until late in May, and at the end of
October it was still far from completion. Ill luck had attended
Peterson, the constructor, especially since August. MacBride, the head
of the firm, disliked unlucky men, and at the end of three months his
patience gave out, and he telegraphed Charlie Bannon to leave the job he
was completing at Duluth and report at once at the home office.
Rumors of the way things were going at Calumet under the hands of his
younger co-laborer had reached Bannon, and he was not greatly surprised
when MacBride told him to go to Chicago Sunday night and supersede
Peterson.
At ten o'clock Monday morning, Bannon, looking out through the dusty
window of the trolley car, caught sight of the elevator, the naked
cribbing of its huge bins looming high above the huddled shanties and
lumber piles about it. A few minutes later he was walking along a
rickety plank sidewalk which seemed to lead in a general direction
toward the elevator. The sidewalks at Calumet are at the theoretical
grade of the district, that is, about five feet above the actual level
of the ground. In winter and spring they are necessary causeways above
seas of mud, but in dry weather every one abandons them, to walk
straight to his destination over the uninterrupted flats. Bannon set
down his hand bag to button has ulster, for the wind was driving clouds
of smoke and stinging dust and an occasional grimy snowflake out of the
northwest. Then he sprang down from the sidewalk and made his way
through the intervening bogs and, heedless of the shouts of the
brakemen, over a freight train which was creaking its endless length
across his path, to the elevator site.
The elevator lay back from the river about sixty yards and parallel to
it. Between was the main line of the C. & S. C., four clear tracks
unbroken by switch or siding. On the wharf, along with a big pile of
timber, was the beginning of a small spouting house, to be connected
with the main elevator by a belt gallery above the C. & S. C. tracks. A
hundred yards to the westward, up the river, the Belt Line tracks
crossed the river and the C. & S. C. right of way at an oblique angle,
and sent two side tracks lengthwise through the middle of the elevator
and a third along the south side, that is, the side away from the river.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account