Central-Station Electric Lighting: With Notes on the Methods Used for the Distribution of ElectricityHedges, Killingworth
History
Central-Station Electric Lighting: With Notes on the Methods Used for the Distribution of Electricity
Hedges, Killingworth
Electric light plants -- Europe
The eight glow lamps forming
one group are in many cases scattered in different streets, often quite
out of sight of each other. Under such circumstances, the substitution
of one light centre, however powerful, for every eight could only be
done by leaving many spots in complete darkness. To give a usefully
diffused light by means of arc lamps, their number would have to be
considerably greater than ninety-two, or, in other words, the standard
of street lighting would have to be raised, and for this the town was
not prepared to pay.
The business has now passed into the hands of the Anglo-American
Corporation of London, who are extending the installation by placing
alternating current dynamos at the station to work transformers for
the supply of houses so as to utilise the original plant for street
lighting only, as, even with the advanced knowledge of the present day,
it is doubtful whether for this purpose a more economical system could
be employed.
CLASS V.
THE DISTRIBUTION WITH SECONDARY BATTERIES, OR THE BATTERY TRANSFORMER
SYSTEM.
Mr. Lane Fox was the first to put forward a complete system of
electrical supply on this plan, Fig. 23.
[Illustration: FIG. 23.
G Generating station. A Accumulators (secondary batteries).
R Returns. M Mains or conductors.
L Lamps. X Meters.
]
The system is discussed by him as follows:[4]—
“The chief points of the system is the use of a generator in a central
position, from one pole of which insulated conductors or mains are led
to the several points where the electric energy is to be utilised,
being branched and sub-branched as much as required, and thence back
to the other pole of the generator by an uninsulated conductor, such
as the gas or water pipes. At certain points, storage or secondary
batteries are set up in connection, on one hand, with the mains,
sub-mains, and branches, as the exigencies of the case may require,
and, on the other, with the return conductor.”
[4] Hedges on the Supply of Electricity by Local Authorities.
Proceedings of Association of Municipal and Sanitary Engineers and
Surveyors, vol. ix. (1882-83), p. 159.
“The combination of generators, circuit and storage batteries is such,
that when the current from the generators falls below the demands made
on it from the various outlets to the mains at which its energy is
utilised, the deficiency is made up from the storage batteries, which
act in unison to supply the requisite quantity of energy. On the other
hand, when the current from the generator exceeds in point of quantity
the demands upon it at the various outlets, the excess goes to charge
the storage batteries and to create a reserve to be called upon in case
of need.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account