Charlestown Navy Yard: Boston National Historical Park, Massachusetts — John Shaqi
Charlestown Navy Yard: Boston National Historical Park, MassachusettsUnited States. National Park Service
History
Charlestown Navy Yard: Boston National Historical Park, Massachusetts
United States. National Park Service
Boston Naval Shipyard (Boston, Mass.) -- History; Charlestown Navy Yard (Mass.) -- History
These actions represent a period when the yard workers, though not yet
unionized, could strike—an option later denied to government employees.
While workers were generally forced to accept the prevailing pay and
conditions at the yard, they were not completely without power.
In the Charlestown Navy Yard’s first half-century, world events, U.S.
politics, and sectional rivalries affected the ebb and flow of work and
the hiring and firing of men. The yard was born in the midst of a world
at war and grew to prominence in a time of relative calm—in retrospect,
the lull before the storm of civil war.
[Illustration: _Sloop-of-war_ (_U.S.S._ Decatur _or_ Dale) _dry
docked in Charlestown has its rigging tarred and its hull sheathed
with copper, about 1852_.]
_Continues on page 29_
Building a Wooden Ship
The creation of a wooden warship began in the mold loft. There
carpenters translated specifications from standard plans for each class
of vessel into full-sized wooden patterns. These were used to fashion
hull members, for which white oak or live oak were the favored woods.
(Some 2,000 trees were required for a 74-gun ship-of-the-line.) On the
slightly inclined building ways, joiners first laid the keel, the great
spine of the ship running along the bottom of the hull. Then they
attached the stem and the stern post to the keel and raised the
frames—the vessel’s ribs. The frames formed the contours of the hull
and, together with horizontal deck beams and vertical stanchions beneath
the beams, provided a strong skeleton. After 1829, iron and copper bolts
and spikes replaced many of the wooden “treenails” that secured the
structural members and fastened the deck and hull planking. The rudder
was hung, the hull caulked and sheathed with copper to protect it from
teredo worms, and the ship was launched. Riggers then “stepped” masts to
the keelson, a lengthwise beam bolted to the keel (_see page 19_). After
they rigged the horizontal spars, cordage, and sails, the new warship
was ready for outfitting.
[Illustration: _Expanding U.S. interests in the Pacific spurred
Congress in 1825 to authorize a new class of sloop-of-war to protect
those interests. Charlestown Navy Yard constructed three of them
between 1825 and 1827._]
1 Building ways
2 “Shears”: hoisted heavy pieces
3 Keel
4 Stern post
5 Frames
6 Deck beams
7 Planking
8 Drag chains: arrested ship after launch
9 Shiphouse
The Workforce in 1835
138 Carpenters
56 Ropemakers
40 Laborers
37 Joiners
34 Blacksmiths
25 Sailmakers
19 Riggers
18 Coopers
17 Plumbers
16 Boatbuilders
14 Sparmakers
12 Blockmakers
11 Painters
6 Caulkers
6 Masons
6 Sawyers
The Frigate _Constitution_
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account