Charlestown Navy Yard: Boston National Historical Park, MassachusettsUnited States. National Park Service
History
Charlestown Navy Yard: Boston National Historical Park, Massachusetts
United States. National Park Service
Boston Naval Shipyard (Boston, Mass.) -- History; Charlestown Navy Yard (Mass.) -- History
The Roosevelt administration’s program to stimulate the economy, provide
jobs, and pull the nation out of the Depression was the first step in
Charlestown’s transformation into a true ship construction yard. Under
FDR’s 1933 National Industrial Recovery Act, 32 new warships were
authorized, 20 of them destroyers, of which two were assigned to
Charlestown. The following year, growing worries about Japanese
aggression moved Congress to further expand the Navy.
The yard kept a rapid pace in the 1930s, laying two keels simultaneously
in Dry Dock 2 in 1934 and again in 1935. (As the shipways was inadequate
for destroyers, all keels were laid in this dock until 1939.) After
floating, the hulls were moved into Dry Dock 1 for completion, the whole
process taking about two years.
Repair work was much reduced in the 1930s by federal economy measures
specifying lengthened maintenance intervals. As both dry docks were in
any case usually tied up in construction work, and because most of the
ships in for repair were relatively small, many of these vessels were
floated into a large cradle and hauled from the water up the tracks of
the yard’s marine railway. Others were taken across the harbor to the
South Boston dry dock.
Technological change transformed many of the yard’s oldest trades by the
1930s, while the growing size and complexity of ships required more and
more workers. Such large government employers as shipyards were seen by
policy makers as places to both promote economic stability and save
money. Early in the Depression these two goals were addressed,
respectively, with lower and upper limits for each yard’s workforce—at
Charlestown, 1,500 and 1,800. The workforce stayed generally within
these limits until 1935, when it began growing, reaching some 5,000
workers by late 1939. (During hard times the yard kept its eye on the
future, exempting apprentices from layoffs.)
By the time war had begun in Europe in 1939, with “readiness” again
America’s watchword, the yard was operating at an even faster rate of
production than in the mid-thirties. With the shipways enlarged to
handle destroyers, six ships were in some stage of construction that
summer. In October four destroyers were floated out of Dry Dock 2 on the
same day. The yard also prepared 18 of the old World War I four-stacker
destroyers for transfer to Britain under the 1940 destroyers-for-bases
agreement.
Then came the war. If the thirties had been a period of gearing up,
wartime pushed the yard into overdrive. It took a great war effort for
the yard to realize its true shipbuilding and manufacturing potential,
confirming a statement by Secretary of the Navy George von Meyer in
1910: “Navy yards are primarily for war and only incidentally for
peace.” One historian’s conservative estimate: under the goad of war the
yard built, repaired, overhauled, converted, or outfitted some 6,000
vessels between 1939 and 1945.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account