Comparison of Methods of Sewage PurificationPhillips, Theodore Clifford
Science
Comparison of Methods of Sewage Purification
Phillips, Theodore Clifford
Sewage -- Purification
Many eminent men have advocated special material as coal, coke, clinker
slag, sand, and gravel, and even glass for filling material. The results
do not differ materially and Prof. L. P. Kennicutt in an article in the
Journal of the Association of Engineering Societies, February 1900 makes
the following statement, “The material should be more or less porous so
as to have a larger water absorbing area and have a jagged surface on
which the gelatinized micro-organisms can be easily retained.”
“The quantity of sewage that can be successfully treated by intermittent
filtration has been shown not to be over 100,000 gallons per acre per
day, a quantity so small as to be quite useless for towns and cities
which would be obliged to construct beds with sand not “in situ”. This
point was quickly perceived in England where sand “in situ” is not of
common occurrence. These bacteria beds were not used long before the
problem arose: Can the amount of land required by the intermittent
filtration method be so reduced that the construction of artificial
bacteria beds will be a practical possibility?
“The results of the investigation started by this problem have given us
what is known as the contact system of treatment and the septic tank
treatment and have apparently shown not only that by combining these two
methods the amount of area required for 100,000 gallons can be reduced
from one acre to about one seventh of an acre but also that the
bacterial treatment is possible with sewage containing manufacturing
refuse, and have outlined how sewage containing storm water may be
treated.”
It has been found by experiment that after two or three weeks there is a
marked reduction in the initial capacity of the tank due to breaking
down of the filling material and also to the filling material becoming
charged and coated over with a gelatinous slime consisting of living
organisms and organic matter in the process of transformation.
If the bed is not overworked the capacity of the tank will remain
constant after the first two or three weeks, showing that the durability
is unlimited.
The beds are usually filled in half an hour, and the sewage allowed to
remain on them about two hours when the effluent is run off and the beds
allowed to rest several hours before again being filled.
By contact beds in series, the number depending upon the kind of sewage,
almost any degree of purification can be obtained.
The Engineering Record of Jan. 27, 1900 gives a very interesting account
of the sewage disposal works at Sutton, England. The works were
constructed in 1891–93, and comprise an area of 28 acres, 18 acres only
being capable of irrigation. They were originally designed for chemical
precipitation and broad irrigation, but after giving these methods a two
years’ trial the local board found itself unable to satisfy the
requirements of the conservators of the River Thames, into which the
effluent flowed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account