The disposal plant was constructed under the supervision of the Iowa
Engineering Company of Clinton, Iowa, on a 15 acre tract of land, one
and a half miles south of the city. Although original plans called for
18 beds with five feet of gravel, only four beds each 275 feet by 75
feet were finished, and instead of 5 feet of ground only 24 inches was
used. The plant was complete in July 1899 and was operated until
December, when it was discontinued on account of cold weather, it not
being considered necessary to operate it during the winter. From
December until April the sewage was discharged directly into a creek
which runs along one side of the land.
The beds have no automatic device for distributing the sewage at
definite intervals of time, but are connected with the main sewer by a
number of gate valves which were regulated by the attendant. The sewage
is distributed by means of a wooden sluice way which extended the entire
length of the bed and has six inch openings on the side every 16 feet
which gave a fairly even distribution.
Although no analysis of the sand and gravel was made, it was apparent
that the uniformity coefficient was very large.
The material was shipped a distance of 90 miles and resembles ordinary
ballast used for rail roads. The largest pieces were thrown along the
sluice way to prevent excessive washing. The finest of the sand was of a
size which would be considered too fine for good mortar sand. No attempt
was made to screen the material. The gravel would not be considered
first class for filtering beds.
Samples of the sewage and effluent were taken at two different times.
The first was between 9:00 and 10:30 A. M., April 20, 1900. Until the
day before no sewage had been applied to the beds since last fall. The
second collection was made two weeks later, when samples of the sewage
and effluent were collected at intervals of one hour during the day, and
mixed into composite samples. The sewage was taken from a manhole just
above the beds, and the effluent from the outlet of the underdrain about
900 feet below the beds.
The analysis is given in Table I. and the results show that the beds are
not working as efficiently as might be expected from a first class
plant. This may be accounted for from the fact that the filtration is
too rapid and that the material which is less than two feet in depth is
not suitable for such a purpose.
TABLE I.
Analyses of Sewage and of Effluent from Intermittent Downward Filtration Plant
at Mendota, Ills.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account