It is not possible during the construction of a railroad to tell what it
costs per mile because all the foundation work, the construction of
bases from which to work, the equipment for construction, and much of
the material is a charge which must be spread over the entire completed
line. The best estimate that can be made to-day as to the newly
constructed road is that it has cost between $70,000 and $80,000 per
main-line mile, or between $60,000 and $70,000 per mile of track.
This cost per mile includes the building of the most difficult and
expensive stretch of line along the entire route from Seward to
Fairbanks--that running along Turnagain Arm, which is sheer rock rising
precipitously from the sea for nearly 30 miles. There are miles of this
road which have cost $200,000 per mile. Even to blast a mule trail in
one portion of this route cost $25,000 a mile.
The only Government-built railroad--that across the Isthmus of
Panama--cost $221,052 per mile. The only two recently built railroads in
the United States are (1) the Virginian, built by H.H. Rogers, which
cost exclusive of equipment $151,000 per mile, with labor at from $1.35
to $1.75 per day and all machinery, fuel, rails, and supplies at its
door, and (2) the Milwaukee line to Puget Sound, which is estimated as
having cost $130,000 per mile exclusive of equipment.
The work has been conducted with its main base at Anchorage, which is at
the head of Cook Inlet. The point was chosen as the nearest point from
which to construct a railroad into the Matanuska coal fields. That was
the primary objective of the railroad, to get at the Matanuska coal.
From Anchorage it was also intended to drive farther north through the
Susitna Valley and across Broad Pass, and to the south along Turnagain
Arm toward the Alaska Northern track. To secure coal for Alaska was the
first need. So in addition to Anchorage as a base, one was also started
at Nenana, on the Tanana River, from which to reach the Nenana coal
fields lying to the south. If these two fields were open, one would
supply the coast of Alaska and one the interior. This program has been
acted upon, with the result that the Matanuska field is open to
tidewater with a downgrade road all the way. The Nenana road has been
pushed far enough south to touch a coal mine near the track, which may
obviate the immediate necessity for reaching into the Nenana field
proper.
There is an open stretch across Broad Pass to connect the Susitna
Valley with the road coming down from Nenana. This gap closed, there
will be through connection between Seward and Fairbanks.
MATANUSKA COAL.
By decisions of the Commissioner of the Land Office all of the claims in
the Matanuska coal field were set aside, and by act of Congress a
leasing bill was put into effect over the entire field. Under this law a
number of claims must be reserved to the Government. The field was
surveyed, and some of the most promising portions of the field have been
so reserved.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account