Establishing a Grade.--If the grades are light, they should be
established by use of a telescope level. Most of the cheap levels are a
delusion. A stake driven flush with the surface of the ground at the
outlet becomes the starting point, and by its side should be driven a
witness stake. Every 100 feet along the line of the proposed drain and
laterals similar stakes should be driven. Their levels should then be
taken, and when the fall from the head of the system to the outlet is
known, the required cut at each 100-feet station is easily determined.
It may be necessary to reduce or increase the grade at some point to
get proper depth in a depression or to save cutting when passing
through a ridge.
Cutting the Trenches.--There are ditching-machines that do efficient
work. The best are costly. Most of the work on farms will continue to
be done with ditching-spades. The ground should be moved when wet, so
that labor can be saved.
A line should be used to secure a straight side to the trench. The
grade should be obtained by means of a system of strings. If two light
poles be pushed into the ground at each 100-feet station, one on either
side of the proposed trench, and a string be drawn across at a point
5-1/2 feet above the bottom of the proposed trench, these strings will
be in line on a grade 5-1/2 feet above the grade the drain will have.
As the cut at the station is known, the height of the string above the
top of the stake is easily determined. These strings will reveal any
inaccuracy in the survey. The workman can test every part of the bottom
of the trench by use of a rod 5-1/2 feet high, the top end being
exactly in line with the strings when the lower end is placed on the
correct grade of the trench. This device is better than running water
where grades are slight.
A drain scoop should be used in bottom of the trench to make a resting
place for the tile that will prevent any displacement by the soil when
the trench is filled.
Depth of Trenches.--Underdrains may be placed too deep in close soils
for best results. In an early day it was advised that the drains be put
down 4 feet deep. We now know that a tight clay soil may give best
results from a drain only 28 inches deep, or even a little less. In a
looser soil 3 feet is a better depth, and in porous swamp lands the
drain may well go 4 feet deep, thus permitting increase in distance
between drains.
Connections.--The laterals should enter the branches and mains near the
top, so that the water will be drawn out rapidly. The tile should be
laid with close joints at the top, so that the water may enter more
freely from the sides than the top. No covering other than moist soil
is needed unless there is very fine sand, when paper over the joints
will serve a good purpose. After some moist soil from the sides of the
trench has been tramped upon the tile, the trench may be filled by use
of a breaking-plow or winged scraper.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account